7
Commissioning steps
Inspection steps
Maintenance steps
Page
•
1. Checking the high limit safety cut-out setting
................................................................
8
•
2. Filling the heating system with water and venting
.........................................................
8
•
3. Fully opening the rotary damper in the flue outlet and securing it
...............................
8
•
•
•
4. Commissioning the system
...............................................................................................
8
•
5. Minimising pulsation noise
...............................................................................................
9
•
•
6. Shutting down the system
.................................................................................................
9
•
•
7. Opening the boiler door
.....................................................................................................
9
•
•
8. Separating the neutralising system from the heat exchanger module and
connecting the drain hose
................................................................................................. 10
•
•
9. Cleaning the combustion chamber and heating surfaces
............................................. 10
•
•
10. Checking gaskets and thermal insulation components
................................................. 10
•
•
11. Checking all connections and the sensor well on the heating water side for
tightness
............................................................................................................................. 11
•
•
12. Checking the function of the safety equipment
.............................................................. 12
•
•
•
13. Checking the pressure switch function
........................................................................... 12
•
•
•
14. Checking the temperature controller setting if a building management system is
used (DCC system)
............................................................................................................ 13
•
•
•
15. Expansion vessel and system pressure
......................................................................... 13
•
16. Cleaning the sight glass in the boiler door
...................................................................... 14
•
•
17. Closing the boiler door
...................................................................................................... 14
•
18. Checking the thermal insulation
....................................................................................... 14
•
•
19. Checking the water quality
................................................................................................ 14
•
•
20. Cleaning and reconnecting the condensate drain system
............................................. 14
•
21. Checking the installation room ventilation
•
22. Checking the flue system for tightness
•
•
23. Adjusting the burner
.......................................................................................................... 15
•
•
24. Checking the flue gas side tightness
............................................................................... 16
•
25. Instructing the system user
.............................................................................................. 16
•
26. Operating and service documents
................................................................................... 16
Commissioning, inspection, maintenance
Steps - commissioning, inspection and maintenance
5692910