18
Note
Various installation components can be found in a sep-
arate pack. Keep the installation components safe, as
they will be required for later installation.
2.
1.
37
37
Fig. 6
1.
Replace gaskets.
Internal diameter of gaskets:
Gas connection Ø 18.5 mm
Note
Gasket for gas connection is attached to the gas
shut-off valve.
2.
Suspend the Vitodens from the wall mounting
bracket.
Note
After mounting, ensure correct seating.
3. Note
Only remove the locking clip under the gas pipe
union nut once the appliance has been installed.
Clip is no longer required.
Installation sequence
Fitting the boiler to the wall mounting bracket
6174240
Installation