46
Mains power supply in conjunction with on-site power consumption
Without power-OFF
kWh
G
F
L
kWh
F
L
E
kWh
N
E1E2
D /D
L1 L1 L2 L2 L3 L3
C
A
M
N
N
A
~~
=
D
H
K
M
F
B
F
Fig. 46
A
Heat pump
B
Additional consumers (of power generated on site)
in the household
C
Electricity meter
D
Inverter
E
Isolator for the PV system
F
Terminal
G
Double-tariff meter (for special tariff for heat pump)
Not
permissible in conjunction with PV systems for
on-site power consumption
H
Bi-directional meter (for PV systems to consume
power on site):
Energy taken from power supply utility and energy
fed into power supply utility
K
Meter with reverse block:
For energy generated by PV system
L
Isolator for the domestic power supply connection
(distribution panel)
M
Distribution panel
N
Domestic distribution box
Smart Grid
■
The Smart Grid functions are switched via both PSU
floating contacts.
■
Both floating contacts are connected to the
EA1 extension in accordance with Fig. 47.
Installation sequence
Power supply
(cont.)
5700 562 GB
Installation