13
Floorstanding installation
4x
4x
E
A
C
D
2.
1.
B
Fig. 3
4x
4x
B
C
D
E
A
2.
1.
Fig. 4
A
Support for floorstanding installation (accessories)
B
Gravel bed as condensate soakaway
C
Concrete foundations (see technical guide)
D
KG conduit DN 100 (only with entries below
ground level)
E
Rubber mounts (supplied)
Note
We recommend letting condensate drain away
freely
(without condensate pipe).
Wall mounting
Installation must
only
be performed with the bracket
set suitable for wall mounting (accessory).
Separate installation instructions
Installing the internal unit
Transport
The cylinder module can be removed for easier han-
dling: See page 16.
Installation sequence
Installing the external unit
(cont.)
5700 562 GB
Installation