63
Commissioning steps
Inspection steps
Maintenance steps
Page
•
18. Commissioning the system
........................................... 74
•
19. Ticking the heat pump type on the type plate of the
internal unit (according to external unit type plate)
•
•
•
20. Checking the heat pump for unusual noises (e.g.
operating noise of fan, compressor and pump);
venting again if required
•
•
•
21. Checking the system function (e.g. actuators,
temperatures, heat meter if applicable)
........................ 82
•
22. Instructing the system user
........................................... 82
Commissioning, inspection, maintenance
Steps - commissioning, inspection and…
(cont.)
5601 429 GB
Service