![Viessmann 7424689 Installation And Service Instructions Manual Download Page 33](http://html1.mh-extra.com/html/viessmann/7424689/7424689_installation-and-service-instructions-manual_1017806033.webp)
33
Tighten the nuts with the following torques:
Type
AWB/
AWB-AC
Line
Connection to
external unit
Torque in Nm
201.A04
Liquid line
7
6 mm
⁷
⁄
₁₆
UNF
14–18
Hot gas line
7
12 mm
¾ UNF
50–62
201.A07
Liquid line
7
10 mm
⅝
UNF
33–42
Hot gas line
7
16 mm
⅞
UNF
63–77
201.A10
Liquid line
7
10 mm
⅝
UNF
33–42
Hot gas line
7
16 mm
⅞
UNF
63–77
201.A13
Liquid line
7
10 mm
⅝
UNF
33–42
Hot gas line
7
16 mm
⅞
UNF
63–77
Connection to the internal unit
2.
1.
3.
2x
D
C
D
C
D
C
C
Liquid line
D
Hot gas line
Installation sequence
Connecting the refrigerant lines
(cont.)
5601 429 GB
Installation