Maintenance sheet
Type of intervention
Date / Time
Notes
Stamp and signature of the
Authorized Service Centre
WASHING:
*
Tank
*
Evaporator filter
REPLACEMENT:
*
Evaporator filter
*
Antibacterial
CHECK:
*
Level sensors
*
Pumps
*
Water capacity
*
Solenoid valve
/ /
WASHING:
*
Tank
*
Evaporator filter
REPLACEMENT:
*
Evaporator filter
*
Antibacterial
CHECK:
*
Level sensors
*
Pumps
*
Water capacity
*
Solenoid valve
/ /
WASHING:
*
Tank
*
Evaporator filter
REPLACEMENT:
*
Evaporator filter
*
Antibacterial
CHECK:
*
Level sensors
*
Pumps
*
Water capacity
*
Solenoid valve
/ /
WASHING:
*
Tank
*
Evaporator filter
REPLACEMENT:
*
Evaporator filter
*
Antibacterial
CHECK:
*
Level sensors
*
Pumps
*
Water capacity
*
Solenoid valve
/ /
WASHING:
*
Tank
*
Evaporator filter
REPLACEMENT:
*
Evaporator filter
*
Antibacterial
CHECK:
*
Level sensors
*
Pumps
*
Water capacity
*
Solenoid valve
/ /
94