3.Installation
The place where the heater will be installed must have sufficient air supply necessary for
combustion and must meet the construction standards and regulations.
The heater must be filled with granite stones broken into pieces not larger than 100 mm in
diameter; the gap for air circulation must be left (Pic. 1).