3.4.3
Tapping the supply line
When replacing a faulty tapping valve, observe the instruction in
Chapter 2.2.3 ‘Replacing a damaged tapping valve’ on page 7
.
Requirements:
n
A leakage test has been carried out
.
▶
Screw the spindle in as far as possible using a ratchet or a spanner.
▶
Unscrew the spindle to open the operation shut-off.
3.4.4
Commission the house service connection
▶
Check for proper function.
▶
Carry out floor filling work.
Take care to avoid mechanical damage to the tapping valve during
filling work.
▷
The house service connection is operational.
Handling
Geopress tapping valve
20