Installation
Vision Model 140/150 Installation/Operation Manual
25
PRE
L
IMINAR
Y
Folded Optics
In rear screen applications where space behind the projector is limited, a mirror may be used
to fold the optical path, as shown in Figure 3-6. The position of the projector and mirror must
be accurately set. If you are considering this type of installation, contact your dealer for
assistance.
Figure 3-6. Folded Optics
Other
Considerations
Other considerations and tips that can help improve your installation:
•
Keep the ambient temperature constant and below 35°C (95°F). Keep the projector away
from heating and/or air conditioning vents. Changes in temperature may cause drifts in
the projector circuitry, which may affect performance.
•
Keep the projector away from devices that radiate electromagnetic energy such as motors
and transformers. Common sources of these include slide projectors, speakers, power
amplifiers and elevators.
Screen
Mirror
Summary of Contents for Vision 140
Page 2: ......
Page 76: ...Installation 62 Vision Model 140 150 Installation Operation Manual P R E L I M I N A R Y Notes...
Page 94: ...Operation 80 Vision Model 140 150 Installation Operation Manual P R E L I M I N A R Y Notes...
Page 115: ......
Page 116: ...1 888 4 VIDIKRON Fax 503 748 8161 www vidikron com SERIAL NUMBER 020 0833 01 Rev A March 2008...