Pag. 5 SW42LOC/SW82LOC9904
Connectors and connections
The installation must be carried out only by qualified technical staff: an improper connection of the peripheral
units may cause the sequential switcher to be isolated from the rest of the system
.
Connectors
The SW82LOC - SW82K sequential switcher features 8 BNC video inputs located at the rear of the mechanics
(4 video inputs for SW42LOC - SW42K models ), 2 BNC video outputs (one for the automatic channel and one for the
manual channel), a 15-pole connector for alarm contact connection and a protection fuse:
Power supply
Fuse 50mA 250V T
Video inputs
Video outputs
Alarm contacts
8 7 6 5 4 3 2 1
AUTO MAN
ALARM
Connection of the sequential switcher to peripheral units
Installation example
Installation controlled by one operator with two monitors: the operator can switch each telecamera on the monitor
connected to the manual channel
MATERIAL USED
Video handling:
•
1 sequential switcher
SW42LOC/SW82LOC ( or
SW42K/SW82K
)
•
2 monitors
•
8 telecameras
SW82LOC
Summary of Contents for SW42K
Page 2: ......
Page 3: ......
Page 4: ......
Page 5: ......
Page 6: ...MANUALE D USO...
Page 18: ...OPERATING INSTRUCTIONS...
Page 30: ...MANUEL D INSTRUCTIONS...
Page 42: ...BEDIENUNGSANWEISUNG...