TOOL SETUP
VE26 tools can be used to groove pipe/tubing
that is supported by several different methods .
Refer to the setup instructions listed in this
section for different grooving options .
PIPE VISE SETUP
1.
When grooving pipe/tubing that is supported
with a pipe vise, select a location for the tool
and pipe vise by taking into consideration the
following factors:
a.
Adequate space to handle pipe/tubing
lengths
b.
A firm and level surface for the pipe vise
c.
Anchoring requirements for the pipe vise
2.
Mount a chain-type pipe vise onto a
stand or workbench . The pipe vise should be
mounted flush with, or slightly overhanging,
the edge of the stand or workbench . When the
tool is mounted on the pipe/tubing, the tool
must be able to rotate freely around the pipe/
tubing without being obstructed by the stand or
workbench .
3.
Secure a length of pipe/tubing in the
pipe vise . Pipe/tubing position and pipe vise
anchoring must be capable of handling the
weight of the tool (22 pounds/10 kilograms),
plus the manual effort required to operate the
tool (approximately 20 ft-lbs/27 N•m of torque) .
Position the pipe/tubing to overhang the pipe
vise by approximately 5–12 inches/125–300
mm, as shown, so that the tool can rotate freely .
GROOVE-IN-PLACE SETUP
WARNING
• Depressurize and drain
the piping system before
attempting to disassemble any
Victaulic piping products.
• Pipe hangers must be capable of
handling the weight of the tool and the
manual effort required to operate the
tool.
Failure to follow these instructions could
result in serious personal injury and/or
property damage.
Previously installed pipe/tubing may be
grooved with a VE26 tool, provided that the
pipe/tubing is supported securely and that
the system is completely depressurized and
drained . Pipe hangers must be capable of
handling the weight of the tool (approximately
22 pounds/10 kilograms), plus the manual
effort required to operate the tool (approximately
20 ft-lbs/27 N•m) .
Ensure that there is adequate clearance around
the pipe/tubing to permit proper tool rotation
during the grooving process . Refer to the Tool
Dimensions and Specifications section .
TM-VE26_10
REV_C
TM-VE26
/ Operating and Maintenance Instructions Manual
Summary of Contents for VE26 Series
Page 2: ......
Page 42: ......
Page 43: ...TM VE26_43 REV_C TM VE26 Operating and Maintenance Instructions Manual...