background image

 

 

 

 

 

 

 

 

VIAVI Solutions

 

 

Connect to Fiber Under Test (FUT):

  

 
All fibers and connectors should pass fiber inspection prior to connection, as described on page 1.  The 
OTDR may be connected to the FUT as follows: 

 

 

Figure 3:  Tower Architecture with BBU Jumper

 

 

 

Figure 4: Tower Architecture, no BBU Jumper 

 
1.

 

Inspect and clean the OTDR port on top of the test set. 

2.

 

If the interface to the FUT is the BBU Jumper or Trunk Cable, connect the cable to an optical 
coupler with the same connector type. 

3.

 

Inspect and clean the FUT connected to the coupler or OPP. 

4.

 

Inspect and clean fiber end face of the Launch Cable. 

5.

 

Connect the Launch Cable to the OTDR port. 

6.

 

Inspect and clean the other fiber end face of the Launch Cable. 

7.

 

Connect the Launch Cable to coupler or OPP leading to the RRU. 

 

 

 

Summary of Contents for T-BERD/MTS-2000

Page 1: ... fiber optic patch cord Launch Cable with connectors that match the OTDR Port and Fiber Under Test SC UPC SC APC LC UPC etc Optical Coupler to connect Launch Cable to BBU Jumper Cable or Trunk Cable The following information is required to complete the procedure Type of Fiber Multimode or Single Mode Type of Connectors SC UPC SC APC LC UPC etc Tower architecture o Is there a BBU jumper cable o Is ...

Page 2: ...er 1 Inspect and clean the OTDR port on top of the test set 2 If the interface to the FUT is the BBU Jumper or Trunk Cable connect the cable to an optical coupler with the same connector type 3 Inspect and clean the FUT connected to the coupler or OPP 4 Inspect and clean fiber end face of the Launch Cable 5 Connect the Launch Cable to the OTDR port 6 Inspect and clean the other fiber end face of t...

Page 3: ...nance SM OTDR for single mode fiber or FTTA_RRU_Maintenance MM OTDR for multimode fiber 8 Tap the Load as FTTA Config soft key 9 Tap the Analysis soft key Set BBU Jumper to Yes if there is a BBU Jumper Cable between the Launch Cable and OPP Set BBU Jumper to No if the Launch Cable is directly connected to the OPP Set RRU Jumper to Yes if there is a Junction Box OPP at the top of the tower between ...

Page 4: ...loss or reflectance are shown in RED Use the right and left arrow button to Toggle between results for each wavelength Tap the Zoom soft key to enable zoom controls with the following buttons Toggle between automatic zoom and full trace view Expand and contract trace b SmartLink Summary view The FUT is displayed as a series of icons representing events connectors splices bends etc The center of th...

Reviews: