
Service Manual
29
Chapter 3 OVP Recommended Service
Operational Verification
Operational Verification should be performed between patient use or a minimum of
once each month. Verification may be done by a qualified operator, Allied Healthcare
Trained Hospital Service Technician or Allied Healthcare Technician. Verification is
intended to be done in the hospital. If done by an Allied Healthcare Technician,
there will be a charge.
Certain procedures such as a verification of the alarm circuits should be performed at
least once every 24 hours that the unit is in clinical use. Refer to the BEAR CUB™
750PSV Infant Ventilator instruction manual for details.
Do not use the ventilator unless it passes all the steps in the Operational Verification
Procedure.
Equipment Required
Infant Test Lung
P/N 52000-40027
Patient Circuit
P/N 50000-01147
Oxygen Analyzer
Rubber Stopper
Stop Watch
CAUTION
If any of the following procedures fail to producer the results as outlined in this
document, disconnect the ventilator and contact your authorized VIASYS Healthcare
service technician.
L2346
Revision B
June 2004
Summary of Contents for Bear Cub 750PSV
Page 6: ...6 Bear Cub 750PSV L2346 Revision B June 2004 ...
Page 12: ...12 Bear Cub 750PSV L2346 Revision B June 2004 ...
Page 24: ...24 Bear Cub 750PSV Figure 2 2 Pneumatics System Schematic L2346 Revision B June 2004 ...
Page 36: ...36 Bear Cub 750PSV L2346 Revision B June 2004 ...
Page 44: ...44 Bear Cub 750PSV L2346 Revision B June 2004 ...
Page 46: ...46 Bear Cub 750PSV Figure 5 2 Power Supply Module Assembly 2 of 2 L2346 Revision B June 2004 ...
Page 47: ...Service Manual 47 Figure 5 3 Schematic Diagram Pneumatic 750PSV L2346 Revision B June 2004 ...
Page 48: ...48 Bear Cub 750PSV Figure 5 4 Power Supply PCB Assembly 1 of 3 L2346 Revision B June 2004 ...
Page 49: ...Service Manual 49 Figure 5 5 Power Supply PCB Assembly 2 of 3 L2346 Revision B June 2004 ...
Page 50: ...50 Bear Cub 750PSV Figure 5 6 Power Supply PCB Assembly 3 of 3 L2346 Revision B June 2004 ...
Page 51: ...Service Manual 51 Figure 5 7 Pneumatic Tubing Diagram L2346 Revision B June 2004 ...
Page 52: ...52 Bear Cub 750PSV Figure 5 8 Display PCB 1 of 3 L2346 Revision B June 2004 ...
Page 53: ...Service Manual 53 Figure 5 9 Display PCB 2 of 3 L2346 Revision B June 2004 ...
Page 54: ...54 Bear Cub 750PSV Figure 5 10 Display PCB 3 of 3 L2346 Revision B June 2004 ...
Page 55: ...Service Manual 55 Figure 5 11 Control PCB Assembly L2346 Revision B June 2004 ...
Page 56: ...56 Bear Cub 750PSV Figure 5 12 Wiring Diagram L2346 Revision B June 2004 ...
Page 57: ...Service Manual 57 Figure 5 13 Power Supply Schematic L2346 Revision B June 2004 ...
Page 58: ...58 Bear Cub 750PSV Figure 5 14 Control Schematic PCB 1 of 5 L2346 Revision B June 2004 ...
Page 59: ...Service Manual 59 Figure 5 15 Control Schematic PCB 2 of 5 L2346 Revision B June 2004 ...
Page 60: ...60 Bear Cub 750PSV Figure 5 16 Control Schematic PCB 3 of 5 L2346 Revision B June 2004 ...
Page 61: ...Service Manual 61 Figure 5 17 Control Schematic PCB 4 of 5 L2346 Revision B June 2004 ...
Page 62: ...62 Bear Cub 750PSV Figure 5 18 Control Schematic PCB 5 of 5 L2346 Revision B June 2004 ...
Page 63: ...Service Manual 63 Figure 5 19 Display Schematic PCB 1 of 4 L2346 Revision B June 2004 ...
Page 64: ...64 Bear Cub 750PSV Figure 5 20 Display Schematic PCB 2 of 4 L2346 Revision B June 2004 ...
Page 65: ...Service Manual 65 Figure 5 21 Display Schematic PCB 3 of 4 L2346 Revision B June 2004 ...
Page 66: ...66 Bear Cub 750PSV Figure 5 22 Display Schematic PCB 4 of 4 L2346 Revision B June 2004 ...
Page 68: ...68 Bear Cub 750PSV L2346 Revision B June 2004 ...
Page 96: ...96 Bear Cub 750PSV Figure 11 1 Repacking Procedure L2346 Revision B June 2004 ...