General Information
12
4.5
Delivery and Accessory
The NAOS K4 boiler is delivered as assembled on a pallet, packed in a carton cover. Flue gas ducting is
delivered in accordance with the customer requirements based on the actual connection of air inlet and flue
gas outlet (see chapter 11).
Standard accessory for all boiler versions:
Mounting bracket
1 pcs
Dowel - 8 x 40 mm
5 pcs
Bolt - 5 x 40
5 pcs
Chimney opening reducer piece
1 pcs
External sensor PL10K
1 pcs
Blinding plug D80
1 pcs
Operation and installation manual, including the warranty certificate
A list of contracted servicing organizations
For version NAOS K4G3S24XX (hot water exchanger):
sensor QAZ 36.526/109
1 pcs
Recommended accessory for all boiler versions:
Room thermostat
1 pcs
ALMEVA flue gas ducting, Type: LIK, STAR or FLEX
Water filter
Opentherm (Honeywell CR 04)
The recommended accessory is not included in the boiler standard price.
4.5
Instructions before Putting into Operation
The boiler can only be commissioned by organizations that are authorized and trained for this
purpose by the manufacturer.
The installation shall comply with the regulations that are applicable for this equipment. The boiler shall be
compatible with the local connecting conditions (checking the parameters of the boiler with the information on
the name plate).
During the first start of operation of the boiler it is necessary to instruct the user in accordance with
this manual and to hand over this manual to the user.
Then it is necessary to perform:
-
inspection revision before commissioning,
-
inspection for any water leakages,
-
inspection of instrumentation and safety controls.
Notice:
The ABS boiler cover is protected by a protection foil. This foil needs to be removed before commissioning of
the boiler or 1 month from unpacking the boiler from the packaging carton at the latest. Removing the foil
after this period may be more difficult.