Fig. 12: Aligning the boreholes
5.
Align the boreholes in the slip-on coupling and the basic fork arm.
6.
Insert the locking pin in the lock borehole (Fig. 13/1).
Fig. 13: Inserting the locking pin
7.
Press the pressure point of the locking pin from above until it is in the correct posi-
tion and the yellow marking is visible (Fig. 13/2).
8.
Reduce the pressure so that the locking mechanism becomes active and the pres-
sure point jumps to its starting position (Fig. 13/3).
Operation
Telescoping the ManuTel® SlimLine
V1.09/2019
ManuTel
®
telescopic fork arm Type SlimLine
27