Item no.: 960314.R5
Date 2006-09-11
Issued by: Technology
Class: II
Type: MAN
Page 27 of 32
Safety Regulations for Operators and Technicians
V90 – 3.0MW/V100 – 2.75MW
Vestas Wind Systems A/S · Alsvej 21 · 8900 Randers · Denmark · www.vestas.com
Figure 10 The Crane Winch placed on foundation.
Figure 11 The crane in parked position
General crane functions:
The internal nacelle overhead traverse trolley support 4 lifting functions, each with specific manual.
•
Normal service operation. Max. Work load is 800 kg.
Prior to lowering the trolley must be locked in sideways direction by tightening lock screws ¼ extra
turn after contact and in longitudinally direction locked by keeping the steel wire tensioned and
tightening lock screw for longitudinally direction by tightening lock screws ¼ extra turn after contact .
Warning:
Visual inspect: