6
■
Installation
Installation
Take account of the static erasing range before setting the installation height.
The N-3 can be locked down using the screw holes (M4) on the bottom. See page 6.
* Use a mounting screw that can be sunk up to 6 mm maximum from the
surface of the N-3 housing.
* Do not install the N-3 in a place where it is possibly exposed to water or
oil, dust or dirt, or to high temperature or humidity.
* Prevent obstructions between the N-3 and the object.
* Select a supporting structure of sufficient strength to hold the N-3.
Air hose
Uses an air hose (OD6 mm x ID4 mm) of sufficient pressure resistance.
Air supply
Remo
ve all impurities with a mist separator (0.3μm).
Remove all moisture with an air filter.
Supply air at a temperature of 0~40°C.
Grounding
Provide the unit with proper grounding.
Power supply
Make sure that the unit can be supplied with stable 24V DC power.
Wrong wiring connection may cause a breakdown.
Please make sure all the electrodes are connected according to their polarity before turning on the
unit.
Check before use
Before use, check the unit, tube and power harness in order to make sure there is no damage,
loose screws, disconnected hosing, loose connectors, etc
CAUTIONS
FOR INSTALLATION
REMEMBER
Use an air hose appropriate for required pressure resistance.
Air hoses of insufficient pressure resistance will rupture and leak air.
REMEMBER
Ground the N-3 before use.
Using this unit without proper grounding runs the risk of electric shock.
REMEMBER
Use the N-3 only in the environment specified as follows:
Adverse environments cause product deterioration and breakdown.
Humidity: 35~65%RH (No dewing) Temperature: 5~+40°C
PROHIBITED
Do not use the N-3 in the following environments. Adverse environments
cause product damage and breakdown as well as personal accidents.
Where explosion-proofing is required, where found flammable atmospheres,
high temperature and high humidity, or sharp temperature fluctuations, where
dewing occurs, where possibly wet by water, oil or solvent