![VES 0051-1 Installation, Operation And Maintenance Manual Download Page 13](http://html1.mh-extra.com/html/ves/0051-1/0051-1_installation-operation-and-maintenance-manual_1008624013.webp)
13
ORIGINAL INSTRUCTIONS
VES Andover Ltd Eagle Close Chandlers Ford Ind. Est Eastleigh Hampshire SO53 4NF
Tel: 08448 156060 Fax: 02380 261204 E-mail: [email protected] Web: www.ves.co.uk
Acoustic Supply Unit
Installation, Operation and Maintenance Manual
®
Control panel
Entry point detail
For cable entry proceed as follows
20
. Carefully drill into the unit using an appropriately sized tool.
Suitable cable glands should always be installed. Feed the cable through the cable glands, connect
and provide appropriate cable restraint. A new entry point should be used for each cable entry.
Cable entry Points
20
Fig.
When drilling take extra care to not damage any control panel components. Always use a
drillstop and remove any swarf afterwards.
Continued
Standard Wiring
& Fan Installation
5
Recommended
cable entry points
Important