5 PREPARATION
The application and installation location should be determined and prepared before the Vertiv™ SmartRow™ DCX is
delivered. Proper planning will permit installation of the required power and coolant connections and ensure proper
clearances. The installation location must have:
•
An indoor, climate-controlled environment with the ambient temperature year round between 50°F and 85°F
dry bulb (10°C and 30°C) and less than 60°F (16°C) dew point.
•
Sufficient height and clearance from ceilings, walls, fixtures and overhead sprinkler nozzles for the Vertiv
SmartRow DCX, including its emergency fans and power distribution.
IMPORTANT! The Vertiv SmartRow DCX must be installed on a flat, level surface to maintain proper spacing and
provide tight seals. Leaving gaps in the field-applied gaskets will reduce cooling efficiency and increase energy use.
•
Suitable location for outdoor Liebert® MC condenser, where the equivalent refrigerant piping length will not
exceed values listed in the Liebert® CRV Installation Manual (air-cooled systems).
•
Adequate heat rejection coolant supply for the Liebert CRV (chilled water or water/glycol-cooled systems).
•
Input power sufficient for:
•
Each Liebert CRV—each requires a separate input-power feed.
•
Liebert® EXM - ships as single-input configuration, but may be wired as dual-input.
NOTE: For details about any component’s requirements, refer to that unit’s user manual:
•
Liebert® CRV Installation Manual is SL-11975.
•
Liebert CRV with Liebert® iCOM™ User Manual is SL-11987.
•
Liebert iCOM User Manual is SL-11987.
•
Liebert® EXM 208V User Manual is SL-25650
•
Vertiv™ DCE Rack System User Manual is SL-11992
•
Liebert MBX Busway Track System User Manual is SL-70371
These are delivered with the unit and are available at http://www.vertiv.com/en-us/support/.
5.1 Clearance Requirements
See Vertiv SmartRow DCX dimension details in submittal drawings contained in
Clearances
Minimum, in. (mm)
Liebert EXM UPS system front and back
36 (915)
Liebert CRV cooling unit front and back
36 (915)
Closest building sprinkler to any surface
18 (458)
Between emergency fan module and parallel surface
16 (407)
Table 5.1 Vertiv SmartRow DCX system clearances
5.2 Inspection
Upon receiving a Vertiv™ SmartRow™ DCX, examine the packaging for any signs of mishandling or damage. If any damage
is found, notify your local Vertiv™ representative and the carrier immediately.
Vertiv
| SmartRow™ DCX Installation Manual |
17
Summary of Contents for SmartRow DCX
Page 1: ...Vertiv SmartRow DCX Installation Manual...
Page 6: ...Vertiv SmartRow DCX Installation Manual 6 This page intentionally left blank...
Page 8: ...Vertiv SmartRow DCX Installation Manual 8 This page intentionally left blank...
Page 26: ...Vertiv SmartRow DCX Installation Manual 26 This page intentionally left blank...
Page 28: ...Vertiv SmartRow DCX Installation Manual 28 This page intentionally left blank...
Page 30: ...Vertiv SmartRow DCX Installation Manual 30 This page intentionally left blank...
Page 32: ...Vertiv SmartRow DCX Installation Manual 32 This page intentionally left blank...
Page 40: ...Vertiv SmartRow DCX Installation Manual 40 Figure 10 7 Vertiv SmartRow DCX System typical...
Page 41: ...Vertiv SmartRow DCX Installation Manual 41 Figure 10 8 Vertiv SmartRow DCX Assembly 1 typical...
Page 42: ...Vertiv SmartRow DCX Installation Manual 42 Figure 10 9 Vertiv SmartRow DCX Assembly 2 typical...
Page 43: ...Vertiv SmartRow DCX Installation Manual 43 Figure 10 10 Vertiv SmartRow DCX Assembly 3 typical...
Page 44: ...Vertiv SmartRow DCX Installation Manual 44 Figure 10 11 Vertiv SmartRow DCX Assembly 4 typical...
Page 45: ...Vertiv SmartRow DCX Installation Manual 45 Figure 10 12 Vertiv SmartRow DCX Fan Control vNSA...
Page 47: ...Vertiv SmartRow DCX Installation Manual 47 Figure 10 14 Vertiv SmartRow DCX UPS Spacer Kit...
Page 72: ...Vertiv SmartRow DCX Installation Manual 72 This page intentionally left blank...
Page 73: ......