![Vertiv NetSure 731 A91 User Manual Download Page 13](http://html1.mh-extra.com/html/vertiv/netsure-731-a91/netsure-731-a91_user-manual_1008108013.webp)
Chapter 2 Installation Instruction
5
NetSure 731 A91 Subrack Power System
User Manual
Installed in cabinet
Insert the subrack power system to the matching cabinet, as shown in Figure 2-2.
Power subrack
Figure 2-2 Installed in the cabinet system
The engineering graphics of the subrack power system as shown in Figure 2-3.
1
0
1
.6
7
6
.2
1
0
1
.6
3
7
.7
3
5
5
.2
465.1
482.6
10
7
R3.5
Figure 2-3 Installation size of 731 A91-S1/S2/S3
(
unit:
:
mm
)
Note
1. Tighten the captive screw of the MFU Panel by the cross head screwdriver when there is no operation.
2. Also tighten the handle by the cross head screwdriver.
3. Please plug in the new modules or installing a new panel after removing the rectifier module.
2.4 Electrical Installation
2.4.1 Power System Cabling Method
Cabling from the top of the power system
The top cover is rubber ring top cover.
Summary of Contents for NetSure 731 A91
Page 2: ......
Page 6: ......
Page 8: ......
Page 37: ...Appendix 3 Wiring Diagram 29 NetSure 731 A91 Subrack Power System User Manual...