Vertiv™ NetSure™ -48 VDC Battery Rack System Installation and User Manual
Proprietary and Confidential © 2022 Vertiv Group Corp.
2
4
Installing the System
4.1
General Requirements
•
This product is intended only for installation in a restricted access location on or above a non-combustible surface.
•
This product must be located in a controlled environment with access to Crafts persons only.
•
This product is intended for installation in network telecommunication facilities (CO, vault, hut, or other environmentally
controlled electronic equipment enclosure).
•
This product is intended for connection to the common bonding network in a network telecommunication facility (CO, vault,
hut, or other environmentally controlled electronic equipment enclosure).
•
The DC return connection to this system can remain isolated from system frame and chassis (DC-I).
•
This system is suitable for installation as part of the Common Bonding Network (CBN).
•
The installer should be familiar with the installation requirements and techniques to be used in securing the box framework to
the floor.
•
Clearance requirements are:
a)
Recommended minimum aisle space clearance for the front of the bay is 2' 6".
b)
The battery rack is front accessed for installation, operation, and maintenance. Refer to your company’s standards for
recommended minimum aisle space clearance for the rear of each bay.