Vertiv™ NetSure™ 211 SERIES -48 VDC Battery Cabinet Installation & User Manual (Section 6023)
|
Rev. L
15
Installing Enersys SBS15 Batteries
Procedure
1.
Place the batteries inside the cabinet. Refer to
2.
Insert a spacer between the batteries.
Figure 8:
Placing Enersys SBS15 Batteries
3.
Connect all four Enersys batteries using supplied wires (Part Number 541420) crimped with 12-10 AWG
ring lug on each end, as shown in
Figure 9:
Connecting Enersys SBS15 Batteries
4.
Attach the cabinet wires to + and - terminals. Refer to
Enersys SBS15
Batteries
Spacers
Supplied
quick
connect
lug
Supplied
quick
connect
lug
+ Wire
- Wire
Supplied
cables