![Vertiv Liebert RX User Manual Download Page 27](http://html.mh-extra.com/html/vertiv/liebert-rx/liebert-rx_user-manual_1008069027.webp)
Vertiv
| Liebert
®
RX
™
Remote Distribution Cabinet User Manual |
23
3.0
INSPECTION AND STARTUP CHECKLIST
3.1
Inspection
Exterior Inspection
___ 1. Confirm that the exterior of unit is undamaged.
___ 2. Confirm that service and ventilation clearances are adequate. (See
1.5 - Configurations for Liebert RX
Installation
).
Interior Inspection
___ 1. Open the accent panel.
___ 2. Inspect all wire and conductor insulation for damage.
___ 3. Check all breaker connections for tightness. Retorque if necessary.
___ 4. Check trip settings of adjustable breakers.
___ 5. Check all terminal block connections for tightness. Retorque if necessary.
___ 6. Remove any foreign objects from the components or the interior area of the unit.
___ 7. Check that the intake and exhaust air screens are clean and free of obstructions.
___ 8. Close the accent panel, leaving access to circuit breakers for the following startup procedure.
Unit Serial Number:
Unit Model Number:
Date:
WARNING
Risk of electric shock. Can cause personal injury or death.
Lethal voltages are present during startup procedures. Electrical safety precautions must
be followed throughout inspection and startup. Verify that all incoming power circuits are
de-energized and locked out before performing any internal inspection.
Summary of Contents for Liebert RX
Page 1: ...Liebert RX Remote Distribution Cabinet User Manual ...
Page 33: ......