Installation
Chapter 2: Installation
The Installation process consists of the following procedures, namely-
• Pre-installation
• Installation Preparation
• Mechanical Installation
• Electrical Installation
2.1. Pre-installation
2.1.1. Transportation & Movement
Railway and shipping are the preferred transport options for the CRAC. If transport by rail or by ship is
unavailable, transport by road is recommended. When selecting road transport, roads without too many bumps
are strongly recommended.
• Liebert PEX4 unit is heavy, it is recommended to use the mechanical equipment like electrical forklift to
move the unit.
• Move the equipment to the location near the installation site/ room.
• If an electric forklift is used, insert the tines (forks) of the forklift below the pallet as displayed in
.
shows how the forklift tines (forks) are inserted underneath the pallet and shows in the same
picture below the illustration to the right that the lines should be aligned with the center of gravity to prevent
the equipment from falling over.
Figure 2-1 Moving an Equipment Using a Forklift Truck