19
Figure 16 Installing the guide rail
The completed guide rail installation is shown in
.
Figure 17 Guide rails installed
3.
Place the UPS on the guide rails in the rack, and push it completely into the rack. Use four M6 × 16 screws
to mount the UPS in the rack through the brackets, as shown in
.
NOTE
The guide rail holder must be nearer the front of the rack.
Each end of a guide rail has four installation holes (see
). Do not use the two installation
holes in the middle when attaching the guide rail. Vertiv recommends using the top and bottom
installation holes.
1.
Guide Rail
2. Guide Rail Screws, 4 per Guide
Rail
3. Guide Rail
Holder
4. Square Hole in Rack Rail
Summary of Contents for Liebert ITA2-08KRT208
Page 1: ...Liebert ITA2 8 10kVA 60Hz 208 220V Three Phase UPS User Manual...
Page 40: ...Vertiv Liebert ITA2 User Manual 34 Figure 31 Status page menus...
Page 70: ...Vertiv Liebert ITA2 User Manual 64 NOTES...
Page 71: ...Vertiv Liebert ITA2 User Manual 65...
Page 72: ...Vertiv Liebert ITA2 User Manual 66...
Page 73: ......