Figure 4.12 Dimensions of the Top Frame and the Front Frame (CRD35) (Unit mm (in.))
Item
Description
1
Top frame
2
Front frame
To install the top frame and the front frame:
1.
Open the front door, disconnect the grounding cable from the front door by removing the M4 screw. Disconnect
the power cable and the communications cable from the HMI by unplugging the two connectors from the PWR
port and the CAN1 port.
2.
Remove the front door by removing three hinges that connect the door to the vertical post.
a. Remove the circlip from the bottom of each hinge using a needle nose pliers.
b. Take out the pin from each hinge.
c. Remove two M6 Philips head screws from each hinge.
4 Installing in Enclosure Row
28
Vertiv™ Liebert® CRV CRD25 and CRD35 Row-Based Cooling System User Manual