Figure 4.3 Installing the Baying Brackets
Item
Description
Item
Description
1
Baying bracket (eight pieces)
B
Position to install the screw on the left frame
A
Position to install the screw on the right frame
4.4 Location of the Main Grounding Point
The main grounding point is located on the top panel, as shown in the figure below.
Figure 4.4 Location of the Main Grounding Point
4 Installing in Enclosure Row
21
Vertiv™ Liebert® CRV CRD25 and CRD35 Row-Based Cooling System User Manual