Ferrite Core Installation and Wiring
6-11
Chapter 6: DECT Installation
MBX IP Hardware & Installation Guide
Ferrite Core Installation and Wiring
Ferrite core is provided in the packaging of the Base Station for EMI. The Ferrite core should
be installed when the WTIB4/8 is installed in the MBX IP system. One Ferrite core is to be used
with the line cord between the Base Station and each port of WTIB4/8 (as shown).
Cable Connection with Ferrite Core between WTIB4/8 and Base Station
Th
is
fea
tu
re
is
no
t a
va
ila
ble
at
th
is
tim
e .
..
Release 1.0
November 2010
Summary of Contents for MXB IP
Page 1: ...Hardware Installation Guide Release 1 0 November 2010...
Page 2: ...THIS PAGE INTENTIONALLY LEFT BLANK...
Page 8: ...THIS PAGE INTENTIONALLY LEFT BLANK...
Page 42: ...THIS PAGE INTENTIONALLY LEFT BLANK...
Page 88: ...THIS PAGE INTENTIONALLY LEFT BLANK...
Page 114: ...THIS PAGE INTENTIONALLY LEFT BLANK...
Page 134: ...THIS PAGE INTENTIONALLY LEFT BLANK...