DECT Installation
6-3
Chapter 6: DECT Installation
MBX IP Hardware & Installation Guide
DECT Installation
For detailed instructions on Site Planning for Base Stations, Cell-coverage Region Survey,
RSSI Monitoring, and Base Station Installation, refer to the DECT Installation Guide.
Board Installation
In the MBX IP system, WTIB4 and WTIB8 are both Base Station interface boards. The MBX IP
System can have up to two (with MPB100) or three (with MPB300) WTIB4 (up to 4 ports) or
WTIB8 (up to 8 ports).
WTIB4/WTIB8
The WTIB4/8 can be installed on universal slot 1-6 of any KSU except slot 1 of 1st KSU
and should be installed on the same KSU when installing more than one WTIB4/8.
CAUTION
:
- Prior to installing the WTIB4/8 System power should be turned OFF, to avoid
any damage.
- If the WTIB4/8 is plugged back into the System after being removed, the
WTIB4/8 should be plugged into the original slot to avoid the loss of
programmed data.
Th
is
fea
tu
re
is
no
t a
va
ila
ble
at
th
is
time
...
Release 1.0
November 2010
Summary of Contents for MXB IP
Page 1: ...Hardware Installation Guide Release 1 0 November 2010...
Page 2: ...THIS PAGE INTENTIONALLY LEFT BLANK...
Page 8: ...THIS PAGE INTENTIONALLY LEFT BLANK...
Page 42: ...THIS PAGE INTENTIONALLY LEFT BLANK...
Page 88: ...THIS PAGE INTENTIONALLY LEFT BLANK...
Page 114: ...THIS PAGE INTENTIONALLY LEFT BLANK...
Page 134: ...THIS PAGE INTENTIONALLY LEFT BLANK...