13
Vermont Castings Radiance
Install the Logs
Install the logs
in sequence as shown below. The log
set includes six sections: the rear log, left and right
middle logs, left and right ember logs, and an upper
log. There is also a bag of lava rocks which simulate
charcoal and embers.
1. Install the rear log (#1, Fig. 20) by engaging holes
on its bottom surface with pins on the sheet-metal
shelf at the back of the firebox.
2. Install the left and right middle logs (#2 and #3, Fig.
20) by engaging holes on their bottom surfaces with
pins on the burner brackets.
3. Push the burner assembly fully to the rear. There
should be a gap of about 13/16” between the front of
the burner and the inside front wall of the firebox.
Place the two front ember log sections (#4 and 5,
Fig. 21) in the slot at the front of the firebox, just in
front of the burner.
LO
HI
PILOT
ADJ
PILOT
ON
OFF
Fig. 17 Remove the valve cover plate.
ST172
Fig. 18 Flexible gas line connection.
LO
HI
PILOT
ADJ
PILOT
ON
OFF
ST173
PILOT
ON
OFF
PILOT
ADJ
LO
HI
TPTH
TH
TP
Fig. 19 The gas control valve includes a captured screw-
type pressure test point. A pressure test point upstream from
the control valve is not required.
Pilot
Adjustment
Screw
On/Off
Control
Knob
Pressure Tap
Piezo
Ignitor
Regulator
HV100
Fig. 21 Install the front ember logs.
5
4
ST143
Fig. 20 Install rear and middle logs.
2
1
3
ST142
Brackets