
CONTENTS
Section 1
Information and Requirements
PAGE
1.0
Appliance Information
3-4
1.1
Conditions of Installation
5
1.2
Flue and chimney suitability
5
1.3
Fireplace / surround suitability
6
1.4
Shelf position
6
1.5
Chimney inspection
6
1.6
Fire place opening / catchment space
7-8
1.7
Fitting to Metal Flue Boxes
9
1.8
Hearths
9
1.9
Spillage Monitoring System
9
Section 2
Installation of Fire
2.1
Unpacking the fire
10
2.2
Installing the fire box
10-19
2.3
Gas tightness and inlet pressure (MC models)
20
2.4
Gas tightness and inlet pressure (SC models)
20
2.5
Gas tightness and inlet pressure (RC models)
20
Section 3
Assembling Fuel Bed and Commissioning
3.1
Assembling the ceramics and fuel bed (coal models)
21-24
3.2
Assembling the ceramics and fuel-bed (pebble models)
24-27
3.3
Fixing the Infra-red Eye in position
28
3.4
Connecting the battery pack
29
3.5/3.6 Fitting the trim / fret (all models)
29
3.7
Lighting the appliance (Manual control models)
30
3.8
Lighting the appliance (Slide control models)
30-31
3.9
Lighting the appliance (Remote control models)
32
3.10
Lighting the appliance (Electronic fire control models)
33
3.11
Checking for clearance of combustion products
34
Section 4
Maintenance
4.1
Removal of the Burner Assembly (Manual control models)
35
4.2
Removal of the Piezo Igniter
35
4.3
Removal of the Control Tap
36
4.4
Removal of the Pilot Assembly
36
4.5
Removal of the Burner Assembly (Slide control models)
36-37
4.6
Removal of the Battery Ignitor
37
4.7
Repacing the Battery
38
4.8
Removing the Oxy-Pilot Assembly
38
4.9
Replacing the Control Cable
38-39
4.10
Removal of the Burner Assembly (Remote & EFC models)
40
4.11
Removal of the Valve (Remote & EFC models)
40
4.12
Removal of the EFC trim switch (EFC models only)
40-41
Section 5
User Instruction Section
5.1
Conditions of Installation & About Your New Fire
42-43
5.2
Operating the fire (MC Models)
45
5.3
Operating the fire (SC Models)
45
5.4
Operating the fire (RC Models)
46-47
5.5
Operating the fire (EFC Models)
47
5.6
Remote handset / EFC trim switch malfunction
48
5.7
Cleaning the Fire
49
5.8
Re-assembling the ceramics and fuel bed (coal models)
50-53
5.9
Re-assembling the ceramics and fuel bed (pebble models)
54-56
2