![VERDER VP2-HT CL Installation And Maintenance Instructions Manual Download Page 23](http://html.mh-extra.com/html/verder/vp2-ht-cl/vp2-ht-cl_installation-and-maintenance-instructions-manual_1003740023.webp)
Rev 1.1 Cod. 00.009.127
23
CONNECTIONS
Chlorine Amperometric Chlorine Potentiostatic
Probe Probe
A -
Power cable, 90-250V-50-60Hz
B -
Enable input (dosing consent)
(110Vac; 230Vac; upon request 24V).
OPTIONAL
C -
connector for CL probe.
D -
Level probe connector (3 and 4 contacts).
OPTIONAL
.
E -
Alarm
output connector (3 and 4 contacts).
( 5A 250Vca/30Vdc) NORMALLY OPEN.
OPTIONAL
F -
Flow sensor connector (3 and 4 contacts).
OPTIONAL
G
– ON_OFF switch.
OPTIONAL
DEFAULT SETTINGS
PASSWORD
= Not programmed
Delay On
: 0 minutes
Enable (optional)
: active
Broken Hose (optional)
: active
TAL
: 0 unit (disabled)
Flow (optional)
: Normally Open
Dosing:
Proportional
SetP (setpoint):
1.20ppm
T.MAX (maximum threshold):
0.20ppm
Flow.Max (maximum flowrate):
80%
Delay On:
3 sec (0-999sec)
WARNING!! T
he factory parameters shown are also valid for the pump version combined with the potentiostatic chlorine
probe 0-2.0ppm. In the application of water purification, the desired chlorine values are much lower. So in case of
restoration of the factory parameters the pump must be reprogrammed with the desired chlorine values!!!
DEFAULT SETTINGS RESTORE
3sec
Keep pushing for 3 seconds the
ENTER / MENU
button to
enter into the programming menu.
Move the cursor > to Utility by pressing
▼.
Push
ENTER
button to enter the submenu.
Push ▼ button to move the cursor to “Reset”.
Push
ENTER
button
to confirm
.
By pushing the ▼ button choose “YES” to confirm and push
ENTER
button.
Choose to restore the "Programming Parameters". Press
ENTER
.
Automatically the pump restores the factory settings.
Press the
ESC
button for 3 seconds to exit programming.