![VERDER CARBOLITE GERO ABF 8/28 Installation, Operation And Maintenance Instructions Download Page 42](http://html.mh-extra.com/html/verder/carbolite-gero-abf-8-28/carbolite-gero-abf-8-28_installation-operation-and-maintenance-instructions_1003626042.webp)
8.0 Maintenance
Operational Check
Thorough inspection and report incor-
porating a test of all functions
Performance
Element Circuit
Electrical measurement
Power Consumption
Measure the current drawn on each phase /
circuit
Hearth
Visual check for fit and damage
Cooling Fans (if fitted)
Check whether the cooling fans are working
42
Summary of Contents for CARBOLITE GERO ABF 8/28
Page 11: ...Fig 14 Schematic for Mains Electrical Connections 11 3 0 Installation ...
Page 21: ...4 6 Navigation Diagram 21 4 0 2416 Controller ...
Page 33: ...5 7 Navigation Diagram 33 5 0 Afterburner 2132 Controller ...
Page 40: ...7 0 Operation Photo 3 5 40 ...
Page 53: ...Notes Service Record Engineer Name Date Record of Work ...