1.3
Prerequisites to Use
Prior to the commissioning and use of this product, all personnel involved in its
installation, operation and maintenance must be deemed competent and have:
l
Read and understood the information contained within this manual
l
Received the relevant training with regard to safety and operation of the product
l
Been provided with the appropriate PPE (Personal Protective Equipment) required
for the safe operation of this product
Note:
The customer is responsible for ensuring that all of the above conditions are
satisfied before the product is commissioned for use.
Note:
Unless otherwise specified, the customer is responsible for the
installation of this product and the safe connection of any additional
equipment and gas or liquid supply lines.
5