background image

PV500-27A  07/04 

4

VENTURA

®

 

LOW NOx WATER HEATER

 

MAINTENANCE AND SAFETY INSPECTIONS  (cont'd)

 

 

Periodic Inspection of Operation Components  (cont'd)

 

 

CAUTION:  THE RELIEF VALVE IS A PRIMARY SAFETY DEVICE. 

 

2.  The temperature and pressure relief valve 

may be checked by slowly lifting the seat 
lever on top of the valve to determine its 
condition for safe operation. The openings 
inside the valve may become restricted by 
a buildup of scale and become 
inoperative. If the valve does not open 
and close properly when tested, it must 
be replaced. Replace the relief valve with 
like kind or one meeting the requirements 
stated on the rating decal located 
adjacent to the relief valve. 

 
3.  A table of periodic safety inspections is an 

attachment of this manual for ease of 
reference by the building service 
technician or licensed equipment 
operator.    Since  water  heater  designs 

 

vary, only some of these listed 
inspections may be appropriate for your 
particular model. 

 
4.  PVI strongly recommends the recording of 

significant events, such as maintenance 
or repair actions and safety inspections, 
and encourage the preparation of an 
event log for this purpose. All recorded 
events should be dated, fully described, 
and signed by the individual performing 
the service, repair, or inspection.  (See 
Table 27A-1, page 5 for sample of 
Inspection Record.) 

 

CALL YOUR PVI CUSTOMER SERVICE 
REPRESENTATIVE IF YOU HAVE ANY 
QUESTIONS. (1-800-784-8326) 

 
 

 

 
 

Instructions for Taking Water Heater Out of Service 

 
Extended shutdown of the appliance and 
restarting are as follows: 
 
A.  Turn off all power and fuel supplies. 
 
B. Drain and flush tank as previously 

discussed. 

C.  Tag power switch(es) that fuel is off and 

tank is empty. 

 
D.  Refill tank with water and turn fuel and 

power switch(es) on to restart. Reset all 
controls and conduct start-up of the 
appliance as discussed in the previous 
pages. 

 
 

 
 

ELECTRICAL 

 

1.  Wiring to the unit should conform to the 

National Electrical Code or the code 
legally authorized in your locality. A fused 
disconnect switch should be used for 
water heater control. Service wiring 
connections of 120V, 1 phase, 60 Hz. are 
located in the enclosure on the water 
heater.

 

NOTE:  Use only copper wire of proper 
sizing for incoming service. Damage 
resulting from use of aluminum wiring will 
be excluded from coverage under the 
warranty of this unit.

 

Reviews: