Start Up 

Kinetic MVHR Installation & Commissioning 

18

 

 

Powering Up the Unit 

 

Switching On 

Switch on the power at the mains supply isolator feeding the unit and the fan motors will start. 

Switching Off 

Turn the power off at the mains supply isolator switch. 

 
 

Summary of Contents for Kinetic Plus E

Page 1: ...Copyright 2009 Vent Axia Limited All rights reserved Kinetic Kinetic Plus E MVHR Installation Commissioning Stock Ref N 449059 Kinetic Plus E PLEASE RETAIN THESE INSTRUCTIONS WITH THE PRODUCT...

Page 2: ...ildren should be supervised to ensure that they do not play with the appliance INSTALLATION GUIDANCE 1 The installer is responsible for the installation and electrical connection of the sentinel syste...

Page 3: ...Up the Unit 18 Commissioning Overview 19 Commissioning Control 20 Maintenance Filter Maintenance 22 12 Monthly Maintenance 22 Spares 23 Product Fiche 24 UK Building Regulations Part F Declaration of C...

Page 4: ...ontinuous 24 hour exhaust ventilation of stale moist air from bathrooms toilets and kitchens As the stale air is extracted a heat exchanger within the unit transfers up to 94 of the heat and transfers...

Page 5: ...uency Input 50 Hz nominal Rated Power 190 W max Physical Height excluding spigots 630 mm Width excluding spigots 775 mm Depth 524 including filter flap hinge protrusion Weight 24 kg Spigot diameter 15...

Page 6: ...c MVHR Installation Commissioning 6 Figure 2 Kinetic Plus E Dimensions KINETIC Plus E Performance graph for Vertical and Horizontal Discharge Note Graph show 2 typical system curves with total unit in...

Page 7: ...fety Information on page 2 Unit Installation The Kinetic Plus E unit is typically installed on a wall in a utility room storage cupboard roof void or similar The wall should have sufficient strength t...

Page 8: ...ough 180 degrees and then re attaching them This moves the condensate drain exit from the right rear corner of the unit to the left front corner of the unit when viewed from the front viewing the Cont...

Page 9: ...e required ensure that you use a grommet or gland to protect against potential water ingress 7 Re attach the Cable Inlet Plate on the opposite side of the unit 8 Fit the Control Panel on the opposite...

Page 10: ...the unit 2 Remove the black Cap from the end of the condensate stub at the rear of the unit 3 Fit the vertical condensate pipe and secure with worm drive clip The condensate pipe can be attached with...

Page 11: ...ischarge remove the front cover and locate the condensate stub at the front of the unit 2 Remove the Black Cap from end of condensate stub at the front of the unit 3 On the Kinetic Plus E drill a diam...

Page 12: ...ipe fitted with 22 32mm reducer Fit a U bend condensate drain having a minimum of a 60mm water seal or a HepvO valve to the building s foul water drainage system and ensure there is a minimum 3 degree...

Page 13: ...d with either diameter 180 mm ducting or diameter 200 mm ducting These foam adaptors are to be fixed to the outside of the spigot for diameter 200 mm ducting To move the spigots 1 Remove the spigot by...

Page 14: ...cket positions using the template below A paper copy can be obtained from Vent Axia Technical Support 4 Fit metal wall brackets supplied to the wall using appropriate fixings 5 Fit the stand off feet...

Page 15: ...short piece of flexible duct 100 150 mm long extended to its full length when connecting to ductwork 2 Securely connect this ducting to the spigots using worm drive clips or cable ties 3 Insulate any...

Page 16: ...button on the control unit may be used Table 1 Mains Cable Connections Terminal No Name Cable connection Description L Mains Live Brown 220 240 V AC 50 Hz input N Mains Neutral Blue 220 240 V AC 50 Hz...

Page 17: ...off 2 One end of the power cable supplied is already connected to the unit and routed through the Cable Inlet Plate via a suitable gland to ensure the IP rating of the unit is not affected 3 Connect...

Page 18: ...tallation Commissioning 18 Powering Up the Unit Switching On Switch on the power at the mains supply isolator feeding the unit and the fan motors will start Switching Off Turn the power off at the mai...

Page 19: ...hen commissioning the unit Ensure that the system is installed according to the system designers intent incorporating any acoustic ducting that all joints are air tight ducting is well supported bends...

Page 20: ...potentiometers to suit Figure 3 KINETIC PLUS E Controls Summer Mode The unit is equipped with a Summer Mode for use when the indoor temperature is higher than desired and the outdoor temperature is l...

Page 21: ...s once to activate Boost mode Press once again to exit Boost mode To activate Summer Mode press 3 times in less than three seconds after a short pause the green LED will illuminate and the supply fan...

Page 22: ...or 10 seconds Periodic Maintenance Item Action Fan Filters Change the Fan Filters 1 Open the filter flaps and remove the 2 filters 2 Insert the replacement filters 3 Close the filter flaps 4 Reset the...

Page 23: ...The following spares may be ordered from Vent Axia Kinetic Plus E Spares Part No Description 403732 Control Board 404943 T1 Temperature Sensor 403702 Filters 2 per pack 403733 Heat Recovery Cell 40335...

Page 24: ...iff Pa 350 SPI W m3 h 0 28 Control Factor Control Typology CTRL Typology Control Factor CTRL 0 65 Control Typology Local Demand Control Declared Max Internal External Leakage Rates for BVUs or carry o...

Page 25: ...t being found to be defective the product will be repaired or at the Company s option replaced without charge provided that the product Has been installed and used in accordance with the instructions...