Venmar VCQLA1 Series Installation Use And Care Manual Download Page 8

INST

ALLA

TION MANUAL

INST

ALLA

TION

8

For ADA compliance installation guidelines, please visit www.broan-nutone.com

Recommended Tools  and Accessories
for Installation

• Measuring 

tape 

• 

Phillips screwdriver no. 2

• 

Nutdriver or socket 11/32”

• 

Flat blade screwdriver (to open knockout holes)

• 

Drill, 1/8” drill bit and 1½” hole saw (to mark holes for ducting and cut electrical access hole)

• 

7/64” drill bit (to drill holes for EZ1 brackets mounting screws)

• 

Wood shims (2) and wood screws (4) (required for standard installation to framed cabinet)

• 

Saw (to cut holes for ducted application)

• 

Sheet metal shears (ducted installation only, for duct adjustment)

• 

Pliers (ducted installation only, for duct adjustment)

• 

Metal foil duct tape (for ducted applications)

• 

Scissors (to cut metal foil duct tape)

• Pencil

• Wire 

stripper

• 

Strain relief, 1/2” diameter (to secure house wiring cable to the hood)

Install Ductwork (Ducted Installations Only)

S

OFFIT

18" 

MIN

 - 24" 

MAX

ABOVE

 

COOKING

 

SURFACE

C

ABINET

3¼" 

X

 10" 

DUCT

(F

OR

 

HORIZONTAL

 

DISCHARGE

)

W

ALL

 

CAP

R

OOF

 

CAP

3¼" 

X

 10" 

OR

7" 

ROUND

 

DUCT

(F

OR

 

VERTICAL

DISCHARGE

)

H

OUSE

 

WIRING

(T

OP

 

OR

 

BACK

 

OF

 

HOOD

)

H

OOD

NOTE: Distances over 24” are at the installer and user discretion.

1 ]  

Determine whether hood will discharge vertically (3¼” x 10” or 7” round), 
or horizontally (3¼” x 10” only).

2 ]  

Decide where the ductwork will run between the hood and the outdoors.

3 ]  

Choose a straight, short duct run to allow the hood to perform most efficiently. Long duct 
runs, elbows and transitions will reduce the performance of the hood. Use as few of them as 
possible. When possible, use at least 2 foot straight runs before any turns. Larger ductwork 
may be required for best performance with longer duct runs.

4 ]  

Install wall cap or roof cap (sold separately); ensure there is no leak in house insulation. 
Connect metal ductwork to cap and work back towards the hood location. Use 2” metal foil 
duct tape to seal the joints between ductwork sections.

Summary of Contents for VCQLA1 Series

Page 1: ...WWW VENMAR CA Serial number 99045657 005A WWW VENMAR CA RANGE HOOD Series VCQLA1 INSTALLATION USE AND CARE MANUAL...

Page 2: ...ing Installation 8 20 Recommended Tools and Accessories for Installation 8 Install Ductwork Ducted Installations Only 8 Contents 9 Prepare the Hood 10 12 Prepare the Hood Location 13 EZ1 Person Instal...

Page 3: ...fficient air is needed for proper combustion and exhausting of gases through the flue chimney of fuel burning equipment to prevent backdrafting Follow the heating equipment manufacturer s guidelines a...

Page 4: ...nd you know how to operate it B The fire is small and contained in the area where it started C The fire department has been called D You can fight the fire with your back to an exit Based on Kitchen F...

Page 5: ...beep will be emitted at the first touch and again at the end of the 3 second hold The blower will continue to operate for 10 minutes at this setting During this time the sensor corresponding to the ac...

Page 6: ...lighting and lasting up to 25 times as long as a standard bulb While they are available as service parts these modules are designed to last the life of the hood FILTER CLEANING REMINDER When it is tim...

Page 7: ...WHEELS The center of the fan wheels should be cleaned frequently Use a clean cloth soaked with warm detergent solution STAINLESS STEEL CLEANING Do Regularly wash with clean cloth or rag soaked with w...

Page 8: ...e hood Install Ductwork Ducted Installations Only SOFFIT 18 MIN 24 MAX ABOVE COOKING SURFACE CABINET 3 X 10 DUCT FOR HORIZONTAL DISCHARGE WALL CAP ROOF CAP 3 X 10 OR 7 ROUND DUCT FOR VERTICAL DISCHARG...

Page 9: ...puyer ce bord au mur arri re Utiliser ce gabarit pour marquer vos rep res ne pas tenter de d couper le trou pour le conduit travers le gabarit NOTE Les d coupes incluent le jeu n cessaire l installati...

Page 10: ...ger cup remove the grease filters from the hood by pushing down and tilting filters out 7 ROUND DUCT PLATE 2 SCREWS 1 2 3 4 5 6 7 4 Using a 11 32 nutdriver or socket remove the lock nut retaining the...

Page 11: ...Remove the parts bag taped on the inner back of hood near the left corner Remove the EZ1 brackets from inside the hood by cutting off the tie wrap Discard the tie wrap 6 Remove Electrical Power Cable...

Page 12: ...ter ductwork the 7 round duct plate can be installed up to 1 2 on either side of the hood center 7 ROUND KNOCKOUT PLATE ALSO REMOVE 3 X 10 VERTICAL KNOCKOUT PLATE 3 X 10 VERTICAL KNOCKOUT PLATE 3 X 10...

Page 13: ...10 3 x 14 RECTANGULAR DUCTING 7 ROUND DUCTING OR Use this template for marking do not attempt to cut out the ducting hole through it NOTE These cutouts are clearance holes they do not need to be the e...

Page 14: ...ws Repeat for the other side frame 7 Install the proper installation brackets according to the type of cabinet framed or frameless See below 4 Drill a 1 8 dia pilot hole for house wiring at B location...

Page 15: ...ine on the outer edge of the bracket as shown Slide the bracket towards the center of cabinet and align outside edge of the bracket to marked line keeping the rear end edge leaning on the wall Use a p...

Page 16: ...REAR HOLES A and B While holding the hood run the house power cable into the hood through the strain relief previously installed in step 6 on page 11 4 Unhook the rear holes from the brackets and han...

Page 17: ...s per side in the slots as shown in insets on illustration below 8 For frameless cabinet secure the hood to the cabinet using four 4 no 8 x 5 8 round head wood screws screws and washers included in pa...

Page 18: ...ACCESS HOLE 5 5 CENTER LINE ELECTRICAL ACCESS HOLE IN CABINET BOTTOM WOOD SHIMS RECESSED BOTTOM CABINETS ONLY CABINET FRONT 3 4 1 1 9 47 16 CABINET BOTTOM REAR HOOD MOUNTING SCREWS 2 12 30 HOOD 15 36...

Page 19: ...g screw heads are engaged in narrow end of keyhole slots in top of hood Tighten screws securely and maintain a hold on the hood until completing step 3 3 Secure the hood to the cabinet using two 2 no...

Page 20: ...on page 10 Pay attention to screw 1 location from back of hood point of view it must be located on left side of the lock nut see inset WARNING Risk of electric shock Electrical wiring must be done by...

Page 21: ...se filters removed in step 3 page 10 under Prepare the Hood Non ducted Installation Only Purchase two non ducted filters from your local distributor or retailer see product specification label for fil...

Page 22: ...High W J8 1 2 3 4 5 3 4 5 6 7 1 2 1 2 3 4 5 3 2 1 4 Control Board W BK G Y W PP W BK BK BK BK W Fuse 5A 2 3 4 5 1 1 2 3 4 5 BK O 120 BL 88 PP 60 PN 45 Y 10 W W 5 4 3 2 1 6 User interface 1 2 1 2 3 4...

Page 23: ...SS WITH AUTOTRANSFORMER AND FUSE 1 1 1 1 S97020360 PARTS BAG INCLUDING 4 METAL SCREWS NO 8 18 X 1 2 4 WASHERS 6 ROUND HEAD NO 8 X 5 8 WOOD SCREWS 6 NO 8 X 1 2 COUNTERSUNK WOOD SCREWS 1 1 1 1 S97020466...

Page 24: ...ct or replacement parts to you at no charge You are responsible for all costs for removal reinstallation and shipping insurance or other freight charges incurred in the shipment of the Product or part...

Reviews: