
- 12 -
8. WIRING INSTALLATION (
CONT
’
D
)
Position the outlet within the space covered
by the decorative flue. Place the outlet at a
maximum distance of 24” (from where the
cord exits from the hood). The center of the
outlet must be positioned at 2¾” from the
center of the future hood location (as illustrated
at right). Make sure this does not interfere
with a mounting bracket fastening area or with
the decorative flue (where the flue touches
the wall).
HE011
8
A
F
OR
UNDER
CABINET
INSTALLATION
,
GO
TO
SECTION
17
ON
PAGES
17
AND
18.
9. INSTALL HOOD MOUNTING BRACKET
Construct wood wall framing that is flush with surface of wall studs.
Ensure to assemble wood wall
framing to wall studs for a
solid installation.
Make sure the height of the
framing will allow the mounting
bracket to be secured to the
framing within the dimensions
shown (see illustration at
right).
After wall surface is finished,
carefully center and level the
hood mounting bracket over
installation location. Secure it
to wall framing using 3
no. 8 x 1½” screws.
Using a level, draw a vertical
line up to the ceiling starting
from the mounting bracket
center.
HD0419A
W
ALL STUDS
WARNING
When cutting or drilling into wall, do not damage electrical wiring and other
hidden utilities.
!
F
RAMING BEHIND
DRYWALL