
T-10
04/2005
General Machine T
roubleshooting
ERROR
PROBABLE CAUSE
CORRECTIVE
ACTION
COIN
ACCEPT
ANCE/P
A
YOUT
(Record all errors for reference if V
endo
T
echnical Service is required)
Coin mechanism will not accept coins.
No power to control board.
Check to make sure the red LED on the control board is fl
ashing red. If
flashing, check MDB harness connections. If connections are good,
replace changer
.
Harness from coin mech to board is cut or
disconnected.
Use a meter and check each wire for continuity and ground.
Short in coin mechanism.
Replace coin changer/acceptor
.
Acceptor is dirty or other problem may exist (not
tuned).
Clean acceptor or contact your local coin mech dealer
.
Defective control board.
Replace control board.
No acceptance or rejects a percentage of
good coins.
Coin return lever pressing down on acceptor
’s coin
plunger
.
Make sure changer is mounted correctly and the coin return lever is in the
proper position.
Acceptor is dirty or foreign matter is in the path.
Clean acceptor or contact dealer
.
Coin changer is improperly tuned (if tunable).
Contact manufacturer for tuning.
Defective controller board.
Replace/test controller
.
Always accepts coins but gives erratic/no
credit.
If NO CREDIT
: Defective harness between coin
mech and control board (will have “CC” error).
Check harness for cut wires or wrong/bad connections.
T
est each wire for
continuity or test to ground. If found to be defective, replace.
If ERRA
TIC OR NO CREDIT
:
Acceptor or coin
mech.
Replace coin mech and test.
If NO CREDIT
: Defective controller
.
Replace/test controller
.
Changer will not payout coins.
Defective harness between coin mech and control
board.
T
est vendor
’s manual coin payout. If vendor won’t pay out using the Coin
Payout mode or during sales, check harness for cuts, bad continuity or
wrong connections. If defective, replace and test.
Defective coin mech.
Replace coin mech and test.
Defective controller board.
If coin mech won’t payout coins manually in the Coin Payout mode or
during the Sales Mode and the above two procedures have failed, replace
the control board and test payout both in the Coin Payout mode and during
a sale.
Changer payout buttons are disabled while door is
closed or while in Open-Door Sales Mode.
Enter the Service Mode or access the Coin Payout Mode.
BILL
ACCEPT
ANCE
Bill
Acceptor will not pull bill in.
No power to validator
.
Unplug power
. W
ait for 10 seconds. Reconnect power and see if bill
acceptor cycles. If not, check acceptor harnessing or replace the bill
acceptor
.
Acceptance disabled by coin mech (if present), or
bad harnessing.
Make sure that the coin mech is plugged in (accepts coins) and that the
coin tubes have enough coins to enable bill acceptance.
Coin mech is not operative.
Make sure that the changer harnessing is correctly connected and has
continuity
. Repair or replace if necessary
.
Replace acceptor and test.
If acceptor accepts, bill acceptor was defective.
Summary of Contents for VUE 30
Page 1: ......
Page 2: ...i 01 2008 TABLE OF CONTENTS...
Page 5: ......
Page 6: ......
Page 7: ......
Page 8: ......
Page 9: ......
Page 10: ......
Page 11: ......
Page 12: ......
Page 13: ......
Page 14: ......
Page 15: ......
Page 16: ......
Page 17: ......
Page 18: ......
Page 19: ......
Page 20: ......
Page 21: ......
Page 22: ......
Page 23: ......
Page 24: ......
Page 25: ......
Page 26: ......
Page 27: ......
Page 28: ......
Page 29: ......
Page 30: ...CL 1 04 2005 CLEANING INFORMATION SECTION...
Page 33: ...CL 4 04 2005 NOTES...
Page 34: ......
Page 35: ......
Page 36: ......
Page 37: ......
Page 38: ......
Page 39: ......
Page 40: ......
Page 41: ......
Page 42: ......
Page 43: ......
Page 44: ......
Page 45: ......
Page 46: ......
Page 47: ......
Page 48: ......
Page 49: ......
Page 50: ......
Page 51: ......
Page 52: ......
Page 53: ......
Page 54: ......
Page 55: ......
Page 56: ......
Page 57: ......
Page 58: ......
Page 59: ......
Page 60: ......
Page 61: ......
Page 62: ...C 1 11 2007 CABINET SECTION...
Page 63: ...C 2 11 2007 1 2 3 4 5 6 3 7 8 9 10 11 10 10 13 12 14 15...
Page 67: ...C 6 11 2007...
Page 69: ...C 8 11 2007...
Page 72: ...C 11 11 2007 NOTES...
Page 73: ......
Page 74: ......
Page 75: ......
Page 76: ......
Page 77: ......
Page 78: ......
Page 79: ......
Page 80: ......
Page 81: ......
Page 82: ......
Page 83: ......
Page 84: ......
Page 85: ......
Page 86: ......
Page 87: ......
Page 88: ......
Page 89: ......
Page 90: ......
Page 91: ......
Page 92: ......
Page 93: ......
Page 94: ......
Page 95: ......
Page 96: ......
Page 97: ......
Page 98: ......
Page 99: ......
Page 100: ......
Page 101: ......
Page 102: ......
Page 103: ......
Page 104: ......
Page 105: ......
Page 106: ......
Page 107: ......
Page 108: ......
Page 109: ......
Page 110: ......
Page 111: ......
Page 112: ...T 1 04 2005 TROUBLESHOOTING SECTION...
Page 125: ...T 14 04 2005 NOTES...