6.2. DRAIN CONNECTIONS
The diameter of drain pipe should be equal the diameter of drain pipe on the unit. Drainage pipe and drain pan
connections should be made by ripple and flange to be able to dismantle pipe connections easily in order to
clean up the residue occurred on drain pan and pipes.
The pipe coming out of the drain pan should be connected to a U or P shaped flusher pipe and should be filled
with water in order to not to cause air suction as described below.(Figure 6.2.2.)
Figure 6.2.2. P-Shaped Flusher Application
6.3. ELECTRICAL CONNECTIONS
All electricity connections should be designed and prepared according to EN 60204
– 1 Standards. The
electrical materials, cables and all relevant control and remote control equipment should be chosen and
designed suitable to unit peculiarities and requirements. Electrical wiring diagram is given in Figure 19.1
–
Appendix 1.
7. SAFETY REQUIREMENTS
VENCO heat recovery units are produced according to EN 60204-1 Standards and MD 98/37 EC numbered
European Union Directives and carry the CE signs on themselves. However, the unit can be dangerous if the
unit is not used or the service is given by trained and experienced technicians, and indicated security
ALL ELECTRICAL CONNECTIONS SHALL BE DONE ACCORDING TO EN 60204-1
BY TRAINNED AND AUTHORIZED PERSONEL
ELECTRICAL CONNECTIONS ARE READY FOR PLUG-IN CONNECTION. DO NOT
CUT CABLE AND PREPARE PROPER EQUIPMENT TO CONNECT.
Summary of Contents for VHR 04
Page 8: ...2019 10 8 31 Table 3 2 Dimensions for VHR and VHR EC Models ...
Page 23: ...2019 10 23 31 17 APPENDIX 17 1 APPENDIX 1 Standard Controller SEC Electrical Wiring Diagram ...
Page 24: ...2019 10 24 31 17 2 APPENDIX 2 Functional Controller FEC AC FAN Electrical Wiring Diagram ...
Page 25: ...2019 10 25 31 17 3 APPENDIX 3 Functional Controller FEC EC FAN Electrical Wiring Diagram ...