- 15 -
7.7.
Position the intermediate
Polycarbonate sheet with overlap
to the neighboring sheet and press
it down with the fixing straps.
After all sheets are positioned,
check whether Polycarbonate
sheets position is correct and
whether cellular lines are parallel
to the arch bows. Check the position and tensioning of fixing straps.
Check the fixing strap tensioning at least once a year.
8. INSTALLATION OF THE GREENHOUSE
8.1.
Before starting the work, thoroughly level the site where the
greenhouse will be installed.
8.2.
Dig pits or trenches of adequate length and width under the lugs.
8.3.
Install the assembled greenhouse so that lower crosspieces of the
ends are on a level with the ground and the lugs dig into the ground.
8.4.
Backfill the lugs and tighten the ground.
When lowering the greenhouse into the trench or holes avoid
longitudinal skewing and displacement of fixing straps from the
arches. After the ground is tightened, check that the fixing straps are
not displaced and are located along the arches. Rearrange the straps
when necessary.
The wooden, brick or concrete foundation can be used for fixing the
greenhouse.