background image

 
 

SVEX-W125-3  (Ex)  Explosion proof  PTZ  Camera  Manual 

Book 

Ver:  2.3 

20 

 

 

 

5. FLAMEPROOF STRUCTURE

 

 

„  

Completely  consider  the  explosive  air  getting  into  ex-proof  structure,  which  may  lead  to  explosion 

because  of  some reason  and to confirm  and  ensure camera  explosion  proof performance  based  on  its 

structure gap, length and max temperature it will get to. 

„  

Enclosure shall burden  water  pressure  testing for 1.5Mpa for  10~12 seconds  without  leakage  as pass, 

which is ordered in GB3836.2-2000. 

„  

Camera surface temperature max shall not over 80

℃ 

while it is working. 

 

Window glass adopts steel glass to burden Impact and Heat change testing. 

 

Enclosure protection to IP66 

 

Cable for Camera uses inlaid device to tighten its screw and nut and make cable tight and no move. 

 

 

6. TROUBLE SHOOTING

 

 

 

P14. Trouble shooting

 

Problems

 

Reason

 

Method

 

 

No image

 

Power off

 

Make sure the power is ok

 

Video cable not 
good connection

 

 

Check the Video Cable

 

 

Sometime no image

 

Video cable not 
good connection

 

 

Check the Video Cable

 

 
 
 
 

 

Control error

 

Not good connection 
of Signal cable

 

 

Check Signal Cable is correct connection

 

Too long communication 
distance make signal 
loose

 

 

Add repeaters to make communication 
distance longer

 

 

Signal reflect

 

Short connect the farthest camera decoder 
board

‟120 and add 120Ω resistance to remove 

reflect

 

Not correct Address

 

 

To re-set refer to Manual book

 

Not correct Protocol

 

Not correct Baud rate

 

 
 
 
 
 
 

 

Wash system error

 

No enough pressure in the 
water tank

 

 

Use air pump to add pressure

 

Block  on  the  water  filling 
hole is loose

 

 

Screw down the block with tools to assure airproof

 

The 

gas   leaks 

from 

pressure 

enhancement 

outlet

 

Repair   or   change   the   valve   core   of   pressure 

 

enhancement outlet

 

 

The  gas  leaks  from  water 
spraying outlet

 

Repair or change the valve core of water spraying 

 

outlet

 

Water spraying outlet stop 
up

 

 

Clean out water spraying outlet

 

Water pipe craze

 

Change the water pipe

 

Water tank craze

 

Send it back to factory to repair

 

Summary of Contents for SVEX-W125-3

Page 1: ...YHW125 3 Ex Explosionproof PTZ Camera Manual Book Ver 2 3 EX mark Certificate No License Exd CT6 DIP A20 TA T6 CNEx10 1195 XK06 014 00898 Veilux SVEX W125 3 Explosion Proof PTZ Camera...

Page 2: ...camera be damaged Ensure supply power same as nameplate marked before equipment being powered Do not open the pan tilt and enclosure under humid atmosphere otherwise video picture will be influenced...

Page 3: ...3 1 Caution 7 3 2 Pole Mounting 7 3 3 Bracket Mounting 8 3 4 Cable Working 8 4 APPLICATION 10 4 1 System Connection 10 4 2 Cable Definition 11 4 3 Address Set 12 4 4 Function Set 14 4 5 Circuit board...

Page 4: ...atus for explosive dust Using enclosure and limiting surface temperature for protecting electrical apparatus Chapter 1 Technical requirements this camera owns advantage of small volume light weight an...

Page 5: ...ory set as Pelco D Prepositioning 128 Preposition error 0 1 Auto heating work while temperature under 10 2 4 Camera Data Brand HITACHI Type VK S858EN Mode PAL Scan Line scan CCD 1 4 CCD Line Scan 15 6...

Page 6: ...S Unit weight 27Kg Ship weight 30Kg Mounting fixed bracket base and pole 2 6 Environmental Air pressure 86 106KPa Environment temperature 40 60 Relative humidity U95 RH 25 2 7 Dimension Unit mm P1 SV...

Page 7: ...Fix here Cable out hole Junction box Cable out concrete bolt P4 mount camera and connect cable P3 make the concrete and install a pole As shown in Picture 2 and 4 make the camera bottom Make concrete...

Page 8: ...t hole at proper level and fix the bracket with screw Junction Box shall be at easy work level and cable goes through tunnel or bridge to nearby Junction Box Refer to Picture 2 to mount camera bottom...

Page 9: ...remove tighten nut keep standard gasket and rubber gasket put on screw joint and ex cable Ex cable gasket Cable out Out hole base Screw joint Rubber gasket P8 c as P9 firstly tight screw joint and the...

Page 10: ...ore wire Nut P10 Gasket Taper Volt b As Picture 11 install Ex proof Gland to Armored Cable as the method please refer to Document for Installation of Ex proof Gland Armored cable Out Cover Finished Gl...

Page 11: ...at least 2 meters So while connection the system just connect the cable with Junction Box Composite Cable A special cable one Composite Cable includes one group power one group control and one group v...

Page 12: ...0 0 1 0 0 0 1 10 0 1 0 1 0 0 0 0 138 0 1 0 1 0 0 0 1 11 1 1 0 1 0 0 0 0 139 1 1 0 1 0 0 0 1 12 0 0 1 1 0 0 0 0 140 0 0 1 1 0 0 0 1 13 1 0 1 1 0 0 0 0 141 1 0 1 1 0 0 0 1 14 0 1 1 1 0 0 0 0 142 0 1 1 1...

Page 13: ...208 0 0 0 0 1 0 1 1 81 1 0 0 0 1 0 1 0 209 1 0 0 0 1 0 1 1 82 0 1 0 0 1 0 1 0 210 0 1 0 0 1 0 1 1 83 1 1 0 0 1 0 1 0 211 1 1 0 0 1 0 1 1 84 0 0 1 0 1 0 1 0 212 0 0 1 0 1 0 1 1 85 1 0 1 0 1 0 1 0 213...

Page 14: ...l assistant switch preset operation etc Under PELCO P equipment address might differ 1 digit from output instruction of control system T4 Protocol Set PROTOCOL DIP4 DIP5 PELCO P OFF OFF PELCO D ON OFF...

Page 15: ...provide reliable connection and fix for cables Connection board and main board connect through pins and the main board provides two connector jack to install extend function sub board 5 2 7 1 6 3 4 P1...

Page 16: ...diator Driver heat release device could be used two sides 1 3 4 5 3 4 2 OB RL OB RS P18 Connection board picture T7 Connection board main function definition No Mark Name Function 1 J1 J6 Relay Voltag...

Page 17: ...ra and heater 8 GND DC12V Power Ground 9 12VDC DC12V Power 10 GND DC12V Power Ground 4 7 Control signal connection When this system applies in the industrial environment spot It shall be equipped with...

Page 18: ...am finishes 33 Pan Rotation Flip Pan will rotate 180 degree 34 Pan Zero Position Zero Pan rotates to zero point 63 Sprayer Position Definition Realized by closing Aux switch 1 80 Open AUX1 Open AUX1 f...

Page 19: ...quipped on PTZ base to clean window of PTZ The whole system is composed of 2 5 liter water tank with a pump inside and water nozzle The nozzle position is fixed on the camera base When the window need...

Page 20: ...o cable not good connection Check the Video Cable Sometime no image Video cable not good connection Check the Video Cable Control error Not good connection of Signal cable Check Signal Cable is correc...

Page 21: ...User does not operate as manual book requires User un install the whole product by themselves Lightning or Act of God If there are additional agreements between Veilux and buyer then agreements shall...

Reviews: