background image

 
 

SVEX-W125-3  (Ex)  Explosion proof  PTZ  Camera  Manual 

Book 

Ver:  2.3 

19 

 

 

 

 

 

 

 

97

 

Start Preset Touring

 

1~16 presets touring

 

99

 

Start Scan

 

Start Scan between preset 92 and 93

 

 

 

4.9 Washer System

 

 

1253 camera 

 
 
 

 

window 

 
 
 

Cable outlet 

Water 

tank 

is 

connected to camera 

 

Add water here 

 

Water nozzle 

 

Camera base 

 

 

Cable outlet 

 

window 

 

Add water here 

 

Water nozzle 

 

 

P16. Camera with water tank

 

 

 

The washer system is equipped on PTZ base to clean window of PTZ. The whole system is composed of 2.5 liter 

water  tank  with  a  pump  inside  and  water  nozzle.  The  nozzle  position  is  fixed  on  the  camera  base. When  the 

window needs to be cleaned, run No. 90 Preset (or open AUX. 2 switch). The PTZ will go to special position for 

nozzle and water will spray out on the window for 2 seconds. The wiper will work at this time. When the cleaning 

process  finishes, the  PTZ  will  go  back to the  original position. Pay attention special  spray liquid is required  to 

avoid freezing in low temperature. 

 
 

 

 

P17. Dimension with water tank

 

Summary of Contents for SVEX-W125-3

Page 1: ...YHW125 3 Ex Explosionproof PTZ Camera Manual Book Ver 2 3 EX mark Certificate No License Exd CT6 DIP A20 TA T6 CNEx10 1195 XK06 014 00898 Veilux SVEX W125 3 Explosion Proof PTZ Camera...

Page 2: ...camera be damaged Ensure supply power same as nameplate marked before equipment being powered Do not open the pan tilt and enclosure under humid atmosphere otherwise video picture will be influenced...

Page 3: ...3 1 Caution 7 3 2 Pole Mounting 7 3 3 Bracket Mounting 8 3 4 Cable Working 8 4 APPLICATION 10 4 1 System Connection 10 4 2 Cable Definition 11 4 3 Address Set 12 4 4 Function Set 14 4 5 Circuit board...

Page 4: ...atus for explosive dust Using enclosure and limiting surface temperature for protecting electrical apparatus Chapter 1 Technical requirements this camera owns advantage of small volume light weight an...

Page 5: ...ory set as Pelco D Prepositioning 128 Preposition error 0 1 Auto heating work while temperature under 10 2 4 Camera Data Brand HITACHI Type VK S858EN Mode PAL Scan Line scan CCD 1 4 CCD Line Scan 15 6...

Page 6: ...S Unit weight 27Kg Ship weight 30Kg Mounting fixed bracket base and pole 2 6 Environmental Air pressure 86 106KPa Environment temperature 40 60 Relative humidity U95 RH 25 2 7 Dimension Unit mm P1 SV...

Page 7: ...Fix here Cable out hole Junction box Cable out concrete bolt P4 mount camera and connect cable P3 make the concrete and install a pole As shown in Picture 2 and 4 make the camera bottom Make concrete...

Page 8: ...t hole at proper level and fix the bracket with screw Junction Box shall be at easy work level and cable goes through tunnel or bridge to nearby Junction Box Refer to Picture 2 to mount camera bottom...

Page 9: ...remove tighten nut keep standard gasket and rubber gasket put on screw joint and ex cable Ex cable gasket Cable out Out hole base Screw joint Rubber gasket P8 c as P9 firstly tight screw joint and the...

Page 10: ...ore wire Nut P10 Gasket Taper Volt b As Picture 11 install Ex proof Gland to Armored Cable as the method please refer to Document for Installation of Ex proof Gland Armored cable Out Cover Finished Gl...

Page 11: ...at least 2 meters So while connection the system just connect the cable with Junction Box Composite Cable A special cable one Composite Cable includes one group power one group control and one group v...

Page 12: ...0 0 1 0 0 0 1 10 0 1 0 1 0 0 0 0 138 0 1 0 1 0 0 0 1 11 1 1 0 1 0 0 0 0 139 1 1 0 1 0 0 0 1 12 0 0 1 1 0 0 0 0 140 0 0 1 1 0 0 0 1 13 1 0 1 1 0 0 0 0 141 1 0 1 1 0 0 0 1 14 0 1 1 1 0 0 0 0 142 0 1 1 1...

Page 13: ...208 0 0 0 0 1 0 1 1 81 1 0 0 0 1 0 1 0 209 1 0 0 0 1 0 1 1 82 0 1 0 0 1 0 1 0 210 0 1 0 0 1 0 1 1 83 1 1 0 0 1 0 1 0 211 1 1 0 0 1 0 1 1 84 0 0 1 0 1 0 1 0 212 0 0 1 0 1 0 1 1 85 1 0 1 0 1 0 1 0 213...

Page 14: ...l assistant switch preset operation etc Under PELCO P equipment address might differ 1 digit from output instruction of control system T4 Protocol Set PROTOCOL DIP4 DIP5 PELCO P OFF OFF PELCO D ON OFF...

Page 15: ...provide reliable connection and fix for cables Connection board and main board connect through pins and the main board provides two connector jack to install extend function sub board 5 2 7 1 6 3 4 P1...

Page 16: ...diator Driver heat release device could be used two sides 1 3 4 5 3 4 2 OB RL OB RS P18 Connection board picture T7 Connection board main function definition No Mark Name Function 1 J1 J6 Relay Voltag...

Page 17: ...ra and heater 8 GND DC12V Power Ground 9 12VDC DC12V Power 10 GND DC12V Power Ground 4 7 Control signal connection When this system applies in the industrial environment spot It shall be equipped with...

Page 18: ...am finishes 33 Pan Rotation Flip Pan will rotate 180 degree 34 Pan Zero Position Zero Pan rotates to zero point 63 Sprayer Position Definition Realized by closing Aux switch 1 80 Open AUX1 Open AUX1 f...

Page 19: ...quipped on PTZ base to clean window of PTZ The whole system is composed of 2 5 liter water tank with a pump inside and water nozzle The nozzle position is fixed on the camera base When the window need...

Page 20: ...o cable not good connection Check the Video Cable Sometime no image Video cable not good connection Check the Video Cable Control error Not good connection of Signal cable Check Signal Cable is correc...

Page 21: ...User does not operate as manual book requires User un install the whole product by themselves Lightning or Act of God If there are additional agreements between Veilux and buyer then agreements shall...

Reviews: