![Vecstar MRF Series Installation, Operation & Maintenance Instructions Manual Download Page 3](http://html1.mh-extra.com/html/vecstar/mrf-series/mrf-series_installation-operation-and-maintenance-instructions-manual_3728238003.webp)
2.0 MANUAL HANDLING & UNPACKING
2.1 MANUAL HANDLING
Caution this equipment is heavy and should only be lifted from the
base with a person on each corner. Never lift it by the door. Care
should be taken not to trap fingers under the feet.
2.2 UNPACKING
Visually check for any damage to the shipping container.
Visually check for any damage to the equipment.
Open the furnace door and remove any packaging from
the furnace chamber.
It is recommended to vacuum the furnace chamber to remove any
insulation dust due to shipment.
Retain the original packaging if re-shipment is foreseen
or required.
Summary of Contents for MRF Series
Page 12: ...8 0 STANDARD WIRING DIAGRAM...