background image

40

INSTALLATION

Electrical installation

3.9 

or 

3.10

2.11

BAIe

Plug 2

2.1 

or

2.2 

or

2.3 

or

2.4 

or

2.5 

or

2.6

Summary of Contents for BAI e

Page 1: ...l lo og g I In nt te er rf fa ac ce e e ex xt te en nd de ed d V Ve er rs si io on n I In ns st ta al ll la at ti io on n a an nd d O Op pe er ra at ti in ng g I In ns st tr ru uc ct ti io on ns s P Pa ag ge e 2 28 8 5 50 0 27 ...

Page 2: ...ubleshooting 35 Maintenance of the Bus Analog Interfaces BAIe 36 Installation of the Bus Analog Interfaces BAIe 36 Electrical installation 37 Connection of sensors 37 Connection of gauges 40 Connection of alarm outputs 42 Connection of alarm button 43 Connection of data bus 44 Power supply 45 Connection of R type gauges 46 Connection of 4 20 mA gauges 47 Connection of rev counter terminal W 48 Pin...

Page 3: ...k you for choosing VDO We are sure that this system will enhance your comfort and safety at sea In order to ensure easy and safe operation of your VDO Bus Analog Interface BAI you should familiarise yourself with all the functions of the system Please take the time to read this manual carefully in full Should you then nevertheless have any questions or encounter any problems your VDO Kienzle agenc...

Page 4: ...cal system Disconnect the minus pole of the battery before starting work as otherwise there is a risk of short circuits Short circuits can cause cable fires battery explosions and damage to other electronic storage systems Please remember that disconnection of the battery causes all volatile electronic memories to lose their contents and these must then be reprogrammed If work with the power suppl...

Page 5: ...or bridging of the fuse holder are impermissible VDO Bus Analog Interface BAIe The BAI is an interface used to receive digital sensor data in SAE J1708 1587 format from a GBI or an EDB The data received are converted into analogue measurement signals and used to activate analogue display instruments All outputs can be programmed individually for various instrument characteristics Programming is pe...

Page 6: ...SAE J1587 SAE document description of data transfer MID Message Identifier address of the data source see SAE J1587 PID Parameter Identifier designation of the record see SAE J1587 The functions of the Bus Analog Interface BAIe The Bus Analog Interface BAIe can receive digitised sensor data in SAE J1708 1587 format and use these data to activate analogue display instruments from the VDO Standard o...

Page 7: ...e as listed below MID 112 BAIe address Plug 1 Pin No Designation MID PID Remarks 1 5 Alarm silent 112 254 Alarm silent Plug 2 Pin No Designation MID PID Gauge type 2 1 Temperature 1 120 105 Temp 120 C 250 F 2 2 Temperature 2 120 176 Temp 150 C 300 F 2 3 Pressure 1 120 102 Pressure 2 Bar 48 Psi 2 4 Pressure 2 121 100 Pressure 10 Bar 150 Psi 2 5 120 168 Any impedance 2 6 Fuel level 120 96 Level gaug...

Page 8: ...1 Alarm 1 OFF ON 100 C 3 2 Alarm 2 OFF ON 132 C 3 3 Alarm 3 ON 0 48 Bar OFF 3 4 Alarm 4 ON 1 90 Bar OFF 3 5 Alarm 5 ON 10 8V ON 16V 3 6 Alarm 6 ON 10 OFF 3 7 Alarm 7 ON 10 V OFF 3 8 Alarm 8 ON Alarm output 8 is the collective alarm for alarms 1 7 34 BASIC SETTINGS ...

Page 9: ...ing Fault Cause Remedy VDO BAIe does not function Check the electrical connections against the installation diagram Check the on board voltage Supply voltage 10 8 32 V DC Examine contact and isolating points for corrosion and soiling ...

Page 10: ... on pages 30 and 31 Installation of the BAIe Mount the BAIe in the vicinity of the instruments When selecting the installation location remember that the cable between the BAIe and the analogue instruments may be max 5 m long The cable exit side of the BAIe must point downwards If the BAIe is to be installed horizontally the cable exit side must be angled downwards by 5 36 INSTALLATION ...

Page 11: ...Electrical installation Connection of a temperature sensor to the BAIe 37 INSTALLATION BAIe Plug 1 1 1 or 1 2 or 1 6 ...

Page 12: ...Connection of a pressure sensor to the BAIe 38 INSTALLATION BAIe Plug 1 1 1 or 1 2 or 1 6 ...

Page 13: ...Connection of a fuel level sensor to the BAIe 39 INSTALLATION BAIe Plug 1 1 1 or 1 2 or 1 6 ...

Page 14: ...40 INSTALLATION Electrical installation 3 9 or 3 10 2 11 BAIe Plug 2 2 1 or 2 2 or 2 3 or 2 4 or 2 5 or 2 6 ...

Page 15: ...41 INSTALLATION Alarm outputs BAIe Plug 3 See page 50 for pin assignment ...

Page 16: ...42 INSTALLATION Alarm button If terminal 1 5 is connected to UBatt any collective alarm activated Plug 3 Pin 8 is deactivated and the BAIe sends an Alarm silent command to the bus BAIe Plug 1 1 5 ...

Page 17: ...NSTALLATION Data bus One of the following connections is necessary for receipt of the digitised data 1 BAIe to EDB 2 BAIe to GBI BAIe Plug 1 1 3 1 4 BAIe Plug 1 1 3 1 4 EDB Plug 1 1 4 1 3 GBI Plug 1 1 4 1 3 ...

Page 18: ...44 Power supply BAIe Plug 1 1 11 1 10 1 9 Selection of fuses Fuse 1 5 A Fuse 2 5 A 1 INSTALLATION 2 ...

Page 19: ...45 INSTALLATION Connection of R type gauges R type gauges are temperature pressure or fuel level gauges BAIe Plug 2 2 1 or 2 2 or 2 3 or 2 4 or 2 5 or 2 6 2 11 ...

Page 20: ...46 Connection of 4 20 mA gauges 4 20mA gauges are pyrometers voltmeters and fresh water level gauges BAIe Plug 2 2 7 or 2 8 2 11 INSTALLATION ...

Page 21: ...47 INSTALLATION Connection of rev counter terminal W The rev counter must be set to the following number of pulses 3 75 pulses rev BAIe Plug 2 2 9 or 2 10 ...

Page 22: ...term 15 Ignition plus 1 10 black GND1_ term 31 Chassis earth 1 11 red Vcc1 term 30 Permanent plus Plug 2 Gauges Pin No Colour Function Remarks 2 1 brown Gauge 1 Gauge terminal G 2 2 pink Gauge 2 Gauge terminal G 2 3 yellow Gauge 3 Gauge terminal G 2 4 green Gauge 4 Gauge terminal G 2 5 white Gauge 5 Gauge terminal G 2 6 grey Gauge 6 Gauge terminal G 2 7 blue Gauge 7 Gauge terminal G 2 8 white brow...

Page 23: ...th for gauge 3 10 black GND Chassis earth for gauge 3 11 red Term 30 Output for warning lamps All alarm outputs are internally limited to 300mA Cable lengths cable cross sections The permissible cable lengths for the BAIe are Cable between gauge and BAIe 5m Cable between sensor and BAIe 5m The cable cross sections required for the BAIe are Sensor cable min 0 5 mm2 Gauge cable min 0 5 mm2 Power sup...

Page 24: ... g 1 5 ms half sine wave Dimensions 100 x 110 x 30 mm Plug type AMP 6 3 mm Faston Input Sensor data in SAE J1708 15873 format Inputs for impedance sensors Accuracy 3 C Sensor VDO sensor Outputs 6 outputs for R type gauges Gauge type VDO Ocean Line 2 outputs for 4 20 mA gauges Gauge type VDO Ocean Line 2 rpm outputs dynamo terminal W Gauge type VDO Ocean Line 8 alarm outputs Current carrying capaci...

Reviews: