6. Attach the bracket to the
Ceiling Box ensuring it is secured
tightly.
5. Having identified the house-
hold wiring, connect the building
supply and the product cables
together in the wire connectors as
shown above. Ground connection
can be found on the ceiling
bracket.
Hot = (Black)
Ground = (Green)
Neutral = (White)
L L
E E
N N
4. Thread the cable through the
ceiling loop and into the threaded
tube until it comes out above the
support.
9. After accessing the bulb, gently
close the door. Close the latch and
ensure it is secure.
8.To access the bulb, pull the latch
to release the door.
7. Secure the ceiling rose in place
against the ceiling using the
threaded ring ensuring it is tightly
fitted.
www.vaughandesigns.com
French Chateau Lantern
CL0251