![Vatech PaX-i Insight Installation Manual Download Page 16](http://html1.mh-extra.com/html/vatech/pax-i-insight/pax-i-insight_installation-manual_855964016.webp)
1. Introduction
6
PaX-i Plus / Insight (Model: PCH-30CS) Installation Manual
Installation Site
▪
The PC monitor, emergency cut off switch, and X-ray
Exposure Switch
should be installed near the operator
so that he or she can manage them simultaneously in
an emergency.
▪
Proper shielding of the room is essential: Since these
requirements vary depending on the country, it is the
installer’s responsibility to verify that all applicable
radiation safety requirements.
▪
This equipment should not be installed near other
devices.
▪
Do not install the equipment in an area that is exposed
to strong electromagnetic fields.
▪
Do not install this system in an area where there is the
risk of an explosion.
▪
The electrical installation of this system shall comply
with all local code requirements for electro-medical
systems: IEC 60364-7-710:2002.
▪
It is strongly recommended that a UPS be installed at
the same time as the equipment.
▪
The equipment, PC, and all peripheral devices must be
well-grounded.
Warnings Regarding X-
r
ay Radiation
▪
Failure to install this equipment in an approved location
may be dangerous to the patient and operator.
▪
Stationary radiation shielding must be installed to
protect the operator from radiation.
▪
The X-ray system may cause injury to the patient if
improperly used. Obey all federal and municipal
standards regarding radiation safety.
▪
When exposing the patient to the X-ray, the operator
must be behind a protective wall or take other protective
actions. The operator should remain at least 2 m (7 feet)
away from the X-ray when pressing the
Exposure
Switch
and observe the patient and capture-
progression.
▪
Operators must provide protective clothing to the patient
before X-ray capturing. Pregnant women must consult
with a doctor before being exposed to an X-ray.