background image

 

 

DB-30 & DB-II-30 

Conveyor Drying System  

Assembly & Operating Manual 



Introduction / Safety 



Assembly 3-4 



Component Identification 

5-6 



Operation 7 



Maintenance 8 



Troubleshooting 9 



Dryer & Exhaust Hood Ducting 

10 



Installation: Conveyor Belt Covers 

11 



Warranty / Terms & Conditions 

12 

Serial Number: 

(Please log your machine's serial number and date of purchase for future reference.) 

Date:____

/

____

/

______ 

Electrical Drawing #: 

Rev:______ 

Pg # 

Doc # 01-01-013C 

VTX 

Vastex 
International, Inc. 
1032 N. Irving St.  
Allentown, Pa. 18109 USA 
Phone# 610 434-6004  Fax# 610 434-6607  
Web Site  www.vastex.com 
 

Authorized Representative in Europe: 
Certification Experts BV 
Nieuwstad 100 1381 CE Weesp,  
The Netherlands  
Tel : + 31 (0) 294 – 48 33 55  

Vastex E-mail assistance 

  

Purchasing & Product Info: 

[email protected] 

  

Electrical Support: 

[email protected] 

  

Tech Support, Mechanical Setup, and Operation: 

[email protected] 

  

Screen Printing Issues & Support: 

[email protected]

  

Original Instructions 

Year of Manufacture: 

20____ 

DB-30 Shown as table top 
model, optional legs availa-
ble. 
DB-II-30 is floor model only. 

Summary of Contents for DB-30

Page 1: ...01 01 013C VTX Vastex International Inc 1032 N Irving St Allentown Pa 18109 USA Phone 610 434 6004 Fax 610 434 6607 Web Site www vastex com Authorized Representative in Europe Certification Experts B...

Page 2: ...chamber or conveyor belt Do not remove any cover or guard until power at the main disconnect is switched off and locked out No unauthorized persons are to be allowed inside the control boxes Turn off...

Page 3: ...the floor as shown 2 Bolt together all sections of the conveyor Each section is bolted to the next using 2 3 8 x 3 4 bolts serrated locknuts Photo on right 1 3 Install the Optional leg assemblies usi...

Page 4: ...rol Panel on the right side 10 Tracking the belt is the final step in setting up your Dryer The belt speed should be turned up during belt tracking The model below shows how to track the belt Be sure...

Page 5: ...nging over either edge Pulley The pulleys at either end of the conveyor are made by VASTEX of 4 inch tubing with inch center shaft They are mounted on self aligning flange bearing blocks for precision...

Page 6: ...cle Configuration The Diagrams below show the possible Receptacles needed for the conveyor and chamber of your DB Series Dryer Heat on Light This RED light is wired to the controller It will illuminat...

Page 7: ...r the heater On DB II models there are 2 knobs on each side It is recommended to run the heater height at about 2 3 above the garment The heater can be run at an angle for curing non flat substrates s...

Page 8: ...ll loosen in time from heating and cooling Every three 3 months the power should be turned off at the external disconnect or unplugged and all the points of connection should be inspected and tightene...

Page 9: ...blue wires HIGH SPEED Setting the low speed pot adjustment small screw driver with plastic handle is needed Turn the speed pots clockwise to increase the speed and counterclockwise to decrease The lo...

Page 10: ...10...

Page 11: ...heet Metal Screws Conveyor Front Belt Cover 2 Screws Belt Cover Conveyor Rear 2 Screws Chain Guard Vastex International Inc 1032 N Irving St Allentown Pa 18109 USA Phone 610 434 6004 Fax 610 434 6607...

Page 12: ...me of shipment and all risk of loss or damage in transit shall be borne by Buyer If the Buyer fails to accept the goods from the common carrier or licensed trucker the Seller shall be entitled to clai...

Reviews: