VASTEX DB-30 Assembly & Operating Manual Download Page 11

Vastex International, Inc. 
1032 N. Irving St.  
Allentown, Pa. 18109 USA 
Phone# 610 434-6004   
Fax# 610 434-6607  
Web Site  www.vastex.com 
E-Mail [email protected]
 

Installation: Conveyor Belt Covers 

DB Series and EC-I Series Dryers 

Doc. # 01-01-014 

Tools Required: 1/4” Nut Driver, or 1/4” socket and ratchet 

Package Contents: 
(3) Belt Covers (actual covers may differ from pictures) 
(1) Chain Guard 
(8) Sheet Metal Screws 

Conveyor Front 

Belt Cover 

(2) Screws 

Belt Cover 

Conveyor Rear 

(2) Screws 

Chain Guard 

Vastex International, Inc. 
1032 N. Irving St.  
Allentown, Pa. 18109 USA 
Phone# 610 434-6004   
Fax# 610 434-6607  
Web Site  www.vastex.com 
E-Mail [email protected]
 

Installation: Conveyor Belt Covers 

DB Series and EC-I Series Dryers 

Doc. # 01-01-014 

Tools Required: 1/4” Nut Driver, or 1/4” socket and ratchet 

Package Contents: 
(3) Belt Covers (actual covers may differ from pictures) 
(1) Chain Guard 
(8) Sheet Metal Screws 

Conveyor Front 

Belt Cover 

(2) Screws 

Belt Cover 

Conveyor Rear 

(2) Screws 

Chain Guard 

11

Summary of Contents for DB-30

Page 1: ...01 01 013C VTX Vastex International Inc 1032 N Irving St Allentown Pa 18109 USA Phone 610 434 6004 Fax 610 434 6607 Web Site www vastex com Authorized Representative in Europe Certification Experts B...

Page 2: ...chamber or conveyor belt Do not remove any cover or guard until power at the main disconnect is switched off and locked out No unauthorized persons are to be allowed inside the control boxes Turn off...

Page 3: ...the floor as shown 2 Bolt together all sections of the conveyor Each section is bolted to the next using 2 3 8 x 3 4 bolts serrated locknuts Photo on right 1 3 Install the Optional leg assemblies usi...

Page 4: ...rol Panel on the right side 10 Tracking the belt is the final step in setting up your Dryer The belt speed should be turned up during belt tracking The model below shows how to track the belt Be sure...

Page 5: ...nging over either edge Pulley The pulleys at either end of the conveyor are made by VASTEX of 4 inch tubing with inch center shaft They are mounted on self aligning flange bearing blocks for precision...

Page 6: ...cle Configuration The Diagrams below show the possible Receptacles needed for the conveyor and chamber of your DB Series Dryer Heat on Light This RED light is wired to the controller It will illuminat...

Page 7: ...r the heater On DB II models there are 2 knobs on each side It is recommended to run the heater height at about 2 3 above the garment The heater can be run at an angle for curing non flat substrates s...

Page 8: ...ll loosen in time from heating and cooling Every three 3 months the power should be turned off at the external disconnect or unplugged and all the points of connection should be inspected and tightene...

Page 9: ...blue wires HIGH SPEED Setting the low speed pot adjustment small screw driver with plastic handle is needed Turn the speed pots clockwise to increase the speed and counterclockwise to decrease The lo...

Page 10: ...10...

Page 11: ...heet Metal Screws Conveyor Front Belt Cover 2 Screws Belt Cover Conveyor Rear 2 Screws Chain Guard Vastex International Inc 1032 N Irving St Allentown Pa 18109 USA Phone 610 434 6004 Fax 610 434 6607...

Page 12: ...me of shipment and all risk of loss or damage in transit shall be borne by Buyer If the Buyer fails to accept the goods from the common carrier or licensed trucker the Seller shall be entitled to clai...

Reviews: